Laserfiche WebLink
9• �y <br /> ATTACHMENT <br /> NORESCO is to design and install the following work under the terms and condi.tions of this <br /> agreement to the satisfaction of the City and PG&E. <br /> FACILITIES TO BE INCLUDED in the RE-LAMPING PHASE <br /> Re-lamp existing T-8 fixtures with new T-8 Alto Lamps and clean diffusers <br /> • City Hall <br /> • Fire Station #20 <br /> • Police Facility <br /> • Sandpiper Community Center <br /> • Red Morton Community Center � <br /> Retrofit existing fixtures with new electronic ballast and new T-8 "Alto" lamps <br /> • Communiry Activities Building <br /> • Fire Station #9, # 10 and # 12 <br /> • Main Library and Schaberg Library <br /> • Municipal Services Center <br /> • Fair Oaks Community Center <br /> • Veterans Memorial Senior Center, Senior Center and Senior Center Annex <br /> All above Facilities are to have the foilowing work done: <br /> • All compact fluorescent lamps shall be replaced with matching energy efficient lamps <br /> • All incandescent fixtures shall be replaced with matching energy efficient lamps <br /> • All incandescent exit signs shall be replaced with more energy efficient LED exit signs <br /> • All other lamps shall be re-lamped with their energy efficient equivalents. <br /> • All exterior lighting systems shall be re-lamped to match the existing lamps <br /> • All of the exterior incandescent lighting shall be replaced with new more energy efficient <br /> compact fluorescent fixtures and lamps. <br /> Re-lamp existing outdoor lighting with new metal halide 1000W and 1500W bulbs to <br /> existing fixtures <br /> • Dolphin Tennis Court <br /> • Hawes Park Ball Field <br /> • Mezes Park Tennis Courts <br /> � • Red Morton Park Field and Tennis Courts <br /> • Spinas Park Tennis Courts <br /> Other work that wi!l be comnleted in this Contract include: <br /> l�tAt'.�i [.IBRARY ^ <br /> • Replacement of two 5 hp, three 20 hp and one 25 hp motors with premium efficient motors <br /> compatible for variable torque applications on the supply side of the HVAC equipment <br /> HERKiVER POOL <br /> • Install a new high efficiency (91 % A.F.U.E.) boiler system complete with automatic <br /> electronic temperature controls. <br /> • Install a new 15 hp high efficiency circulating pump with automatic controls <br /> • Install a new sand filter system with automatic back wash system <br /> • Install a new insulated manual pool cover with stainless steel reels <br /> HOOVER POOL <br /> • Install a new sand filter system with automatic back wash system <br /> • Install a new insulated manual pool cover with stainless steel reels <br /> MUNICIPAL SERVICE CENTER ADi�1INISTRATION BUILDING <br /> • Install a new solar window film on the South, West and Eastern exposures <br /> GREE:�' LED TRAFFIC SIGNAL CONVERSION , <br /> • Convert the City's green traffic signals to light emitting diode (LED) models at 56 different <br /> intersections in the city using ITE approved green traffic signal retrofit kits. <br /> _ <br />