Laserfiche WebLink
<br />S. / /1- -f- <br /> <br />CITY OF REDWOOD CITY, CALIFORNIA <br /> <br />Public Works Services - Right-Of-Way Maintenance Division <br /> <br />Sheet: <br />Date: <br /> <br />10f 1 <br />June 30, 2005 <br /> <br />CHANGE ORDER NO: 2 <br />Original Contract Amount: <br /> <br />$569,662.00 <br />($0.00) <br />$56,000.00 <br /> <br />Project: <br /> <br />2003 - 2004 Tree Preservation and Sidew¡ <br />Repair Program <br /> <br />Previous Change Orders: <br />This Change Order: <br /> <br />Accumulative Total: <br /> <br />$625,662.00 <br /> <br />JJR Construction, Inc. <br /> <br />To: <br /> <br />You are hereby directed to make the herein described changes from the plans and specifications or do the following <br />described work not included in the plans and specifications of this contract. All new work herein described shall be done in <br />accordance with the applicable provisions of the plans and specifications, except as specifically modified by this contract <br />change order. NOTE: This change order is not effective until approved by the City. This change order includes all costs and <br />time required to complete the additional work described herein and the contractor shall be entitled to no other compensation. <br /> <br />DESCRIPTION OF CHANGE <br /> <br />COST <br /> <br />1. <br /> <br />Install 4,000 Square Feet of Rubber Sidewalk at $14 per square foot <br />4,000 SF X $14.001 SF <br /> <br />$56,000.00 <br /> <br />TOTAL <br /> <br />$56,000.00 <br /> <br />By reason of this proposed change a <br /> <br />30 <br /> <br />day extension of time will be allowed. <br /> <br />The adjusted contract completion date will be: <br /> <br />September 15, 2005 <br /> <br />Submitted By: <br /> <br />Ralph Pacheco <br />Gordon Mann <br /> <br />Title: <br /> <br />Public Works Supervisor <br /> <br />Date <br /> <br />Approval Recommended: <br /> <br />Title: <br /> <br />Public Works Superintendent <br /> <br />Date <br /> <br />We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree. If this change order is <br />approved, we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services <br />necessary for the work above specified, and will accept as full payment therefor the prices shown above. <br /> <br />Accepted by: <br /> <br />Title <br /> <br />Contractor: <br /> <br />Date <br /> <br />City Approval: <br /> <br />Date <br />