My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 AME - Applied Materials
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 Under $60K
>
Agmt05 AME - Applied Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2008 8:29:31 AM
Creation date
8/11/2005 10:26:13 AM
Metadata
Fields
Template:
Agreement
Contractor Name
AME - Applied Materials & Engineering
PROJECT NAME
historic courthouse reconstruction project
RMP File Number
304.5
Date
8/8/2005
Box
6586
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />A~~~'" [~[P)[P)[lO~[Q) [MJ/Ã\U~[giOB\[l~ &3r ~[M@D[M~~~O[M@~ D[McGa <br />980 41st Street Tel: (510) 420-8190 <br />Oakland, CA 94608 FAX: (510) 420-8186 <br />e-mail: info@appmateng.com <br /> <br />HISTORIC COURTHOUSE RECONSTRUCTION <br /> <br />CITY OF REDWOOD CITY <br /> <br />1. TESTING & INSPECTION FEES <br /> <br />B. DETAILED BREAKDOWN OF FEES <br /> <br />For each of the disciplines requiring our services we have provided the basis used by us for determining the <br />fees. The foHowing is a summary of our testing and inspection fees, followed by a detailed breakdown: <br /> <br />SUMMARY OF FEES <br /> <br />$ 7,270.00 <br />11,700.00 <br />1,560.00 <br />12,760.00 <br />880.00 <br />$ 34,170.00 <br /> <br />1. <br />2. <br />3. <br />4. <br />4. <br />1. <br /> <br />Reinforced Concrete: <br />Structural Steel, High Strength and Epoxy Bolts: <br />Epoxy Anchors: <br />FRP Inspections: <br />Project Management and Final Affidavit: <br /> <br />Reinforced Concrete Inspections <br />Basis: -We have summarized the concrete placements below. <br />-We will inspect reinforcing dowels. <br /> <br /> Cubic No. of Sets of Inspection Hours <br /> Yards Placements Cylinders <br /> Dowels Reinforcin2 Concrete <br />Footings & Embeds -100 1 1 6 6 8 <br />SaG -20 1 1 3 4 4 <br />Walls/Column Encasement -30 1 1 0 4 8 <br />First Floor Slab -20 1 1 4 4 4 <br />Stairs -30 1 1 0 4 6 <br />Roof Deck -30 1 1 0 4 5 <br />Parapet Walls and Sill -15 1 1 4 4 4 <br />Miscellaneous -10 1 1 0 4 4 <br />Total -255 8 8 17 34 43 <br /> <br />a) <br />b) <br />c) <br />d) <br />e) <br /> <br />Mix Design review: Two @ $ 100.00 <br />Reinforcing Dowel InspectIons: 17 hours @ $ 65.00 per hour <br />Reinforcing Placement Inspection: 34 hours @ $ 65.00 per hour <br />Concrete Placement Inspection: 43 hours @ $"'65.00 per hour <br />Concrete Cylinder Tests: 8 sets of 4 cylinders @ $ 120.00 per set <br />Sub-Total <br /> <br />$ 200.00 <br />1,105.00 <br />2,210.00 <br />2,795.00 <br />960.00 <br />$ 7,270.00 <br /> <br />2. <br /> <br />Structural Steel, High Strength Bolts <br />Basis: -As per Glazier Iron, the welding scope is as follows: <br />Shop: Two weeks. <br />Field: Three weeks (2 weeks on the root). <br />As per the UBC and project specifications, we will provide intermittent inspections for <br />single pass fillet welds and continuous inspections for all other welds. We are budgeting <br /> <br />7 1f <br />
The URL can be used to link to this page
Your browser does not support the video tag.