Laserfiche WebLink
• Based on a water supply assessment that the City will <br />stormwater ana <br />wastewater <br />request from the local water service provider (Redwood City), <br />collection <br />discuss whether development of the Project would exceed <br />systems. <br />potable water capacity. Also discuss the potential for <br />recycled water to be used at the project site for appropriate <br />Capacity and <br />uses. <br />utility demand <br />• Projected water use as determined by the Fuscoe <br />assessments and <br />physical <br />Engineering, orotherS,quantify wastewater flow and <br />infrastructure <br />determine the Project's impact on wastewater flow and <br />layouts updated <br />treatment requirements. <br />by Fuscoe <br />• Existing and proposed stormwater drainage systems and <br />Engineering, or <br />assess impacts related to the construction of new <br />other, for water, <br />stormwater infrastructure. <br />sanitary sewer, <br />• Available infrastructure in the region for processing solid <br />storm drainage, <br />energy, and solid <br />waste, and identity any shortcomings or limitations that may <br />waste for each <br />apply. <br />land use <br />scenario. <br />Assumption: <br />Water quality <br />impacts will be <br />analyzed in the <br />Hydrology and <br />Water Quality <br />section of the EIR <br />(Task 4.8). <br />No new long-term <br />or short-term <br />noise <br />measurements <br />will be taken. <br />• Minimal change <br />is anticipated to <br />the Setting from <br />the 2015 Draft <br />EIR. <br />Task 4.14 Transportation & Circulation- Tasks Performed by Feer & Peers <br />Task 1- Data Collection <br />Fehr & Peers will use recently collected (May 2017) intersection counts for intersections 1-8 <br />below and will collect new weekday morning (7:00 to 9:00 AM) and evening (4:00 to 6:00 PM) <br />peak period traffic counts for up to ten additional study intersections preliminarily identified <br />below: <br />1. Veterans Boulevard / Whipple Avenue <br />2. Whipple Avenue/ U.S. 101 Northbound Off -Ramp <br />3. East Bayshore Road / Bair Island Road / Blomquist Street extension (Roundabout) <br />4. Maple Street / Veterans Boulevard* <br />5. Blomquist Street/ Maple Street (Side -street Stop Controlled)* <br />6. Broadway / Woodside Road (State Route 84) / U.S. 101 Southbound Off -Ramp* <br />Page 20 of 26 <br />REV: 11-08-17 PR <br />ATTY/AGR.2017.262/ESA / Harbor View Project <br />