Laserfiche WebLink
EXHIBIT "A" <br />SCOPE OF SERVICES. PROJECT SCHEDULE AND PAYMENT TERMS <br />I. Scone of Services <br />Consultant will evaluate the City's existing SCADA communications network and <br />recommend options for licensing additional radio frequencies. <br />In order to accomplish the above, Consultant will perform the following tasks: <br />Task 1: Kickoff Meetina and Documentation Review <br />Consultant will: <br />• Conduct a kickoff meeting to review project scope and schedule, and gather <br />City's existing documentation. <br />Task 2: Site Visits <br />Consultant will: <br />• Conduct up to 3 site visits and interviews with City staff. <br />• Gather information about the City's current SCADA system design, system <br />operations, and maintenance challenges. <br />• Gather and document information specifically for the following areas: <br />o System communications, <br />o System hardware, <br />o System software, <br />o Data collection and reporting, <br />o System operations, and <br />o Staff roles and responsibilities. <br />Task 3: Communication Svstem Desion, Control Svstem Architecture. Miaration <br />Aooroach. and Budaetary Cost Estimates <br />Consultant will: <br />• Develop a proposed network design focused on the City's: <br />o Data bandwidth requirements, <br />o Cybersecurity for industrial controls, <br />o Ethernet based communications using transmission medium, including <br />radio (licensed, unlicensed, or telecommunications provider based), fiber <br />and copper, and <br />o Secure integration requirements for data exchange with other agencies. <br />• Develop a cost estimate for the above network design, including costs for <br />equipment, installation, and other budgetary requirements. <br />• Develop a high-level controls system architecture based on supported Allen <br />Bradley controllers, with integration to the proposed network design. <br />• Develop and implement an approach for system migration, including a bridge <br />between the existing network and new network, to maintain ongoing operations <br />during the transition. <br />Page 9 of 10 <br />REV: 11-20-17 MI <br />ATTY/AGR.2017.277/West Yost Associates - SCADA Communications Network Design <br />