My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-12-04 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-12-04 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2017 8:54:28 AM
Creation date
11/30/2017 4:16:55 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/4/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REDWOOD CITY EL CAMINO REAL CORRIDOR PLAN <br />r <br />GOALS <br />• Improve the safety and efficiency of vehicular traffic along and across El Camino Real. <br />• Provide a balanced and well-managed parking supply that accommodates demand while maximizing <br />efficiency. <br />a <br />°z <br />m <br />0 <br />7AM TO 9AM <br />4PM To 7PM <br />EXCEPT SAT.AN� SUN. <br />Restricting left turns during peak commute <br />hours can reduce bottlenecks and improve <br />the flow of traffic. <br />28 <br />STRATEGIES <br />10 Work with Caltrans to improve traffic signal timing, <br />which may be adjusted depending on time of day, <br />and traffic signal location to increase throughput. <br />1111 Through development of a Parking Management <br />Plan, ensure that any changes to on -street park- <br />ing on El Camino Real retain adequate spaces to <br />support existing businesses and convenient access <br />for those with limited mobility, though these spaces <br />may be provided on side streets and off-street <br />lots, rather than on El Camino Real itself. Park- <br />ing management strategies may include, working <br />with businesses to create formal mutually benefi- <br />cial arrangements for sharing of existing parking, <br />identifying side streets with available right of way <br />for creating extra on -street parking by convert- <br />ing parallel to diagonal spaces, and working with <br />developers to identify opportunities for public use <br />of parking at certain hours. See also Section 2.2, <br />Off -Street Parking. <br />1S Restrict left turns during peak commute hours to <br />reduce bottlenecks and improve the flow of traffic. <br />T <br />a) <br />aD <br />cD <br />Cn <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.