My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-12-04 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-12-04 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2017 8:54:28 AM
Creation date
11/30/2017 4:16:55 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/4/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REDWOOD CITY EL CAMINO REAL CORRIDOR PLAN <br />Medium -Term <br />Topic <br />Action <br />Corresponding <br />Responsible Party <br />Strategies <br />Short -Term Parking. Introduce short term parking zones on side streets at <br />Community Development, <br />Mobility <br />select intersections for deliveries, loading, rideshare and ride -hailing, and <br />2L <br />Engineering in coordination <br />customer parking. <br />with Caltrans <br />Street Beautification. Carry out an initial street beautification phase that <br />Community Development, <br />Community <br />includes regular sidewalk cleaning, planting of street trees, the installation <br />Public Works, Engineering in <br />Benefits <br />of wayfinding signage, and the creation of a streetlight banner program <br />2P, 4A, 4B, 4N <br />coordination with Caltrans, <br />that features an EI Camino Real Corridor logo and branding scheme. <br />and property owners <br />Intersection Design. Analyze the impact of removing right -turn lanes at <br />the following locations to help determine preferred intersection designs <br />with protected bike lanes: <br />Community Development, <br />Mobility <br />Hopkins Avenue (Southbound) <br />1H <br />Engineering; consultation with <br />• Wilson Street (Northbound) <br />SamTrans and Caltrans <br />• Diller Street (Northbound) <br />• Vera Avenue (Southbound) <br />• Lincoln Avenue (Southbound) <br />Corridor Facade Improvements. Create a Corridor Building and Facade <br />Business <br />Improvement Program through Partnership RWC to help existing businesses <br />4C <br />Community Development <br />Support <br />to make design and structural improvements. <br />Department <br />72 <br />T <br />v <br />cn <br />CD <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.