My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-12-04 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-12-04 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2017 8:54:28 AM
Creation date
11/30/2017 4:16:55 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/4/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REDWOOD CITY EL CAMINO REAL CORRIDOR PLAN <br />Long -Term <br />Topic Action Corresponding Responsible Party <br />Strategies <br />Street Cleaning of Protected Bikeways. Coordinate street cleaning of <br />Mobility protected bikeways; seek funding from adjacent businesses raised through 1K, 2N Public Works Services <br />a Business Improvement/Assessment District, if implemented. <br />Bikeway/ Driveway Demarcation. Clearly demarcate driveways that in - <br />Public Works in coordination <br />Mobility tersect with the Class IV cycletrack using paint or pavement treatments and 1L <br />with Caltrans <br />signage, so as to alert drivers and bicyclists to one another's presence. <br />Connected Street Grid. Establish a new street grid and block structure. Community Development, En - <br />Mobility Break up large and/or underutilized parcels to extend the street grid where 1T gineering in coordination with <br />it is currently lacking or disconnected, including at Center Street. Caltrans & property owners <br />EI Camino Real/ Redwood Ave/ Main St. Consider creating four way <br />Engineering in coordination <br />Mobility intersections at EI Camino Real/Redwood Avenue/Main Street and at EI 1 U <br />with Caltrans <br />Camino Real/Roosevelt utilizing existing traffic signals. <br />80 <br />T <br />a) <br />aD <br />cD <br />0 <br />co <br />
The URL can be used to link to this page
Your browser does not support the video tag.