Laserfiche WebLink
CHAPTER 51 IMPLEMENTATION <br />Long -Term <br />Topic Action Corresponding Responsible Party <br />Strategies <br />Woodside Overpass. Improve sidewalk conditions with improved sight <br />Mobility lines, physical barriers, and lighting and install public art under the Wood- 1 E, 4G <br />Engineering in coordination <br />side Overpass. <br />with Caltrans <br />Crossing Distances. Shorten crossing distance at intersections using me - <br />Mobility dian refuges and, where design permits, refuges associated with protected 1 A, 1 B, 1 H, 2E <br />Engineering in coordination <br />bikeway barriers. <br />with Caltrans <br />Local Circulator. In conjunction with implementation of the Citywide <br />Community Development, En - <br />Transportation Plan and Streetcar Feasibility Study, conduct a feasibility <br />Mobility 1 P <br />study for a local circulator/shuttle with stops along the Corridor and at the <br />gineering in coordination with <br />transit providers as appropriate <br />Transit Center. <br />Mobility <br />Bus Stop Relocation. Work with SamTrans to move the identified bus Engineering in coordination <br />11, 1J <br />stops. with Caltrans and SamTrans <br />v <br />CD <br />0 <br />00 <br />