Laserfiche WebLink
HCM 2010 Signalized Intersection Summary HCM 2010 Signalized Intersection Summary <br />5: EI Camino Real & Maple St 9/1812017 5: EI Camino Real & Maple St 9/1812017 <br />Assigned Phs <br />1< <br />t <br />I <br />rA <br />\ <br />i <br />Movement ` <br />WBL <br />WBR <br />NBT <br />NBR <br />SBL <br />SBT <br />Lane Configurations <br />) <br />r <br />TT <br />r <br />) <br />Tt <br />Traffic Volume (veh/h) <br />61 <br />70 <br />1290 <br />75 <br />70 <br />1481 <br />Future Volume (veh/h) <br />61 <br />70 <br />1290 <br />75 <br />70 <br />1481 <br />Number <br />1 <br />16 <br />8 <br />18 <br />7 <br />4 <br />Initial Q (Qb), veh <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Ped -Bike Adj(A_pbT) <br />1.00 <br />1.00 <br />0.99 <br />1.00 <br />Parking Bus, Adj <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Adj Sat Flow, veh/h/In <br />1863 <br />1881 <br />1827 <br />1881 <br />1863 <br />1845 <br />Adj Flow Rate, veh/h <br />65 <br />74 <br />1372 <br />80 <br />74 <br />1576 <br />Adj No. of Lanes <br />1 <br />1 <br />2 <br />1 <br />1 <br />2 <br />Peak Hour Factor <br />0.94 <br />0.94 <br />0.94 <br />0.94 <br />0.94 <br />0.94 <br />Percent Heavy Veh, % <br />2 <br />1 <br />4 <br />1 <br />2 <br />3 <br />Cap, veh/h <br />438 <br />394 <br />2013 <br />916 <br />95 <br />2360 <br />Arrive On Green <br />0.25 <br />0.25 <br />0.58 <br />0.58 <br />0.11 <br />1.00 <br />Sat Flow, veh/h <br />1774 <br />1599 <br />3563 <br />1580 <br />1774 <br />3597 <br />Grp Volume(v), veh/h <br />65 <br />74 <br />1372 <br />80 <br />74 <br />1576 <br />Grp Sat Flow(s),veh/h/lnl774 <br />1599 <br />1736 <br />1580 <br />1774 <br />1752 <br />Q Serve(g_s), s <br />2.9 <br />3.7 <br />27.5 <br />2.2 <br />4.1 <br />0.0 <br />Cycle Q Clear(g_c), s <br />2.9 <br />3.7 <br />27.5 <br />2.2 <br />4.1 <br />0.0 <br />Prop In Lane <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Lane Grp Cap(c), veh/h <br />438 <br />394 <br />2013 <br />916 <br />95 <br />2360 <br />VIC Ratio(X) <br />0.15 <br />0.19 <br />0.68 <br />0.09 <br />0.78 <br />0.67 <br />Avail Cap(c a), veh/h <br />438 <br />394 <br />2013 <br />916 <br />195 <br />2559 <br />HCM Platoon Ratio <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />2.00 <br />2.00 <br />Upstream Filler(I) <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Uniform Delay (d), s/veh 29.5 <br />29.8 <br />14.6 <br />9.3 <br />44.1 <br />0.0 <br />Incr Delay (d2), s/veh <br />0.7 <br />1.1 <br />1.9 <br />0.2 <br />13.0 <br />0.6 <br />Initial Q Delay(d3),s/veh <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />%ile BackOfQ(50 % ),veh/lnl <br />.5 <br />3.7 <br />13.5 <br />1.0 <br />2.3 <br />0.2 <br />LnGrp Delay(d),s/veh <br />30.2 <br />30.8 <br />16.5 <br />9.5 <br />57.1 <br />0.6 <br />LnGrp LOS <br />C <br />C <br />B <br />A <br />E <br />A <br />Approach Vol, veh/h <br />139 <br />1452 <br />1650 <br />Approach Delay, s/veh <br />30.5 <br />16.1 <br />3.1 <br />Approach LOS <br />C <br />B <br />A <br />Assigned Phs <br />4 <br />6 <br />7 <br />8 <br />Phs Duration (G+Y+Rc), s <br />71.3 <br />28.7 <br />9.3 <br />62.0 <br />Change Period (Y+Rc), s <br />4.0 <br />4.0 <br />4.0 <br />4.0 <br />Max Green Setting (Gmax), s <br />73.0 <br />19.0 <br />11.0 <br />58.0 <br />Max Q Clear Time (g_c+ll), s <br />2.0 <br />5.7 <br />6.1 <br />29.5 <br />Green Ext Time (p -c), s <br />52.2 <br />0.3 <br />0.1 <br />24.9 <br />Intersection Summary <br />1476 <br />69 <br />63 <br />1335 <br />HCM 2010 Ctrl Delay <br />10.1 <br />16 <br />8 <br />18 <br />HCM 2010 LOS <br />4 <br />Initial Q (Qb), veh <br />0 <br />0 <br />EI Camino Real Corridor Plan Synchro 8 Report <br />AM Peak Hour Existing Conditions W -Trans <br />Assigned Phs <br />1< <br />t <br />I <br />rA <br />\ <br />i <br />Movement -NBL <br />8.6 <br />WBR <br />NBT <br />NBR <br />SBL <br />SBT <br />Lane Configurations <br />) <br />r <br />TT <br />r <br />) <br />Tt <br />Traffic Volume (veh/h) <br />92 <br />78 <br />1476 <br />69 <br />63 <br />1335 <br />Future Volume (veh/h) <br />92 <br />78 <br />1476 <br />69 <br />63 <br />1335 <br />Number <br />1 <br />16 <br />8 <br />18 <br />7 <br />4 <br />Initial Q (Qb), veh <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Ped -Bike Adj(A_pbT) <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Parking Bus, Adj <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Adj Sat Flow, veh/h/In <br />1900 <br />1900 <br />1881 <br />1900 <br />1900 <br />1863 <br />Adj Flow Rate, veh/h <br />94 <br />80 <br />1506 <br />70 <br />64 <br />1362 <br />Adj No. of Lanes <br />1 <br />1 <br />2 <br />1 <br />1 <br />2 <br />Peak Hour Factor <br />0.98 <br />0.98 <br />0.98 <br />0.98 <br />0.98 <br />0.98 <br />Percent Heavy Veh, % <br />0 <br />0 <br />1 <br />0 <br />0 <br />2 <br />Cap, veh/h <br />290 <br />258 <br />2410 <br />1084 <br />83 <br />2690 <br />Arrive On Green <br />0.16 <br />0.16 <br />1.00 <br />1.00 <br />0.06 <br />1.00 <br />Sat Flow, veh/h <br />1810 <br />1615 <br />3668 <br />1608 <br />1810 <br />3632 <br />Grp Volume(v), veh/h <br />94 <br />80 <br />1506 <br />70 <br />64 <br />1362 <br />Grp Sat Flow(s),veh/h/lnl810 <br />1615 <br />1787 <br />1608 <br />1810 <br />1770 <br />Q Serve(g_s), s <br />4.6 <br />4.4 <br />0.0 <br />0.0 <br />3.5 <br />0.0 <br />Cycle Q Clear(g_c), s <br />4.6 <br />4.4 <br />0.0 <br />0.0 <br />3.5 <br />0.0 <br />Prop In Lane <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Lane Grp Cap(c), veh/h <br />290 <br />258 <br />2410 <br />1084 <br />83 <br />2690 <br />VIC Ratio(X) <br />0.32 <br />0.31 <br />0.62 <br />0.06 <br />0.77 <br />0.51 <br />Avail Cap(c a), veh/h <br />290 <br />258 <br />2410 <br />1084 <br />163 <br />2690 <br />HCM Platoon Ratio <br />1.00 <br />1.00 <br />2.00 <br />2.00 <br />1.33 <br />1.33 <br />Upstream Filler(I) <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Uniform Delay (d), s/veh 37.2 <br />37.1 <br />0.0 <br />0.0 <br />46.4 <br />0.0 <br />Incr Delay (d2), s/veh <br />3.0 <br />3.1 <br />1.2 <br />0.1 <br />14.0 <br />0.7 <br />Initial Q Delay(d3),s/veh <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />%ile BackOfQ(50 % ),veh/Ir2.5 <br />4.3 <br />0.4 <br />0.0 <br />2.1 <br />0.3 <br />LnGrp Delay(d),s/veh <br />40.2 <br />40.2 <br />1.2 <br />0.1 <br />60.4 <br />0.7 <br />LnGrp LOS <br />D <br />D <br />A <br />A <br />E <br />A <br />Approach Vol, veh/h <br />174 <br />1576 <br />1426 <br />Approach Delay, s/veh <br />40.2 <br />1.2 <br />3.4 <br />Approach LOS <br />D <br />A <br />A <br />Assigned Phs <br />4 <br />6 <br />7 <br />8 <br />Phs Duration (G+Y+Rc), s <br />80.0 <br />20.0 <br />8.6 <br />71.4 <br />Change Period (Y+Rc), s <br />4.0 <br />4.0 <br />4.0 <br />4.0 <br />Max Green Setting (Gmax), s <br />76.0 <br />16.0 <br />9.0 <br />63.0 <br />Max Q Clear Time (g_c+ll ), s <br />2.0 <br />6.6 <br />5.5 <br />2.0 <br />Green Ext Time (p -c), s <br />51.6 <br />0.3 <br />0.0 <br />45.0 <br />Intersection Summary <br />HCM 2010 Ctrl Delay <br />4.3 <br />HCM 2010 LOS <br />A <br />EI Camino Real Corridor Plan 9/18/2017 PM Peak Hour Existing Conditions Synchro 9 Report <br />W -Trans Page 7 <br />(D <br />