Laserfiche WebLink
HCM 2010 Signalized Intersection Summary <br />6: EI Camino Real & Roosevelt Ave 9/1812017 <br />BR NBL NBT NBR SBL SBT SBR SWL SWR ad <br />Lane Configurations <br />) <br />r <br />) <br />rt <br />r <br />) t+ <br />j+ <br />Traffic Volume (veh/h) 173 <br />0 <br />264 <br />143 <br />1099 <br />0 <br />3 1362 <br />34 0 0 <br />Future Volume (veh/h) 173 <br />0 <br />264 <br />143 <br />1099 <br />0 <br />3 1362 <br />34 0 0 <br />Number 7 <br />7 <br />14 <br />5 <br />2 <br />12 <br />1 6 <br />16 <br />Initial Q (Qb), veh 0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 0 <br />0 <br />Ped -Bike Adj(A_pbT) 1.00 <br />1.00 <br />1.00 <br />1.00 <br />1863 <br />1.00 <br />1.00 <br />0.98 <br />Parking Bus, Adj 1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 1.00 <br />1.00 <br />Adj Sat Flow, veh/h/In 1863 <br />1863 <br />1863 <br />1863 <br />1863 <br />0 <br />1863 1863 <br />1863 <br />Adj Flow Rate, veh/h 184 <br />184 <br />281 <br />152 <br />1169 <br />0 <br />3 1449 <br />36 <br />Adj No. of Lanes 1 <br />1 <br />1 <br />1 <br />2 <br />0 <br />1 2 <br />1 <br />Peak Hour Factor 0.94 <br />0.92 <br />0.94 <br />0.94 <br />0.94 <br />0.92 <br />0.92 0.94 <br />0.94 <br />Percent Heavy Veh, % 2 <br />2 <br />2 <br />2 <br />2 <br />0 <br />2 2 <br />2 <br />Cap, veh/h 349 <br />349 <br />311 <br />181 <br />2408 <br />0 <br />6 2058 <br />902 <br />Arrive On Green 0.20 <br />0.20 <br />0.20 <br />0.20 <br />1.00 <br />0.00 <br />0.00 0.39 <br />0.39 <br />Sat Flow, veh/h 1774 <br />1774 <br />1583 <br />1774 <br />3632 <br />0 <br />1774 3539 <br />1552 <br />Grp Volume(v), veh/h 184 <br />184 <br />281 <br />152 <br />1169 <br />0 <br />3 1449 <br />36 <br />Grp Sat Flow(s),veh/h/lnl774 <br />1774 <br />1583 <br />1774 <br />1770 <br />0 <br />1774 1770 <br />1552 <br />Q Serve(g_s), s 9.3 <br />9.3 <br />17.3 <br />8.2 <br />0.0 <br />0.0 <br />0.2 34.4 <br />1.4 <br />Cycle Q Clear(g_c), s 9.3 <br />9.3 <br />17.3 <br />8.2 <br />0.0 <br />0.0 <br />0.2 34.4 <br />1.4 <br />Prop In Lane 1.00 <br />1.00 <br />1.00 <br />1.00 <br />2.6 <br />0.00 <br />1.00 <br />1.00 <br />Lane Grp Cap(c), veh/h 349 <br />349 <br />311 <br />181 <br />2408 <br />0 <br />6 2058 <br />902 <br />VIC Ratio(X) 0.53 <br />0.53 <br />0.90 <br />0.84 <br />0.49 <br />0.00 <br />0.53 0.70 <br />0.04 <br />Avail Cap(c a), veh/h 373 <br />373 <br />332 <br />248 <br />2408 <br />0 <br />71 2058 <br />902 <br />HCM Platoon Ratio 1.00 <br />1.00 <br />1.00 <br />2.00 <br />2.00 <br />1.00 <br />0.67 0.67 <br />0.67 <br />Upstream Filter(I) 1.00 <br />1.00 <br />1.00 <br />0.89 <br />0.89 <br />0.00 <br />1.00 1.00 <br />1.00 <br />Uniform Delay (d), s/veh 36.0 <br />36.0 <br />39.2 <br />39.0 <br />0.0 <br />0.0 <br />49.8 23.3 <br />13.2 <br />Incr Delay (d2), s/veh 1.2 <br />1.2 <br />25.7 <br />15.1 <br />0.6 <br />0.0 <br />60.0 2.0 <br />0.1 <br />Initial Q Delay(d3),s/veh 0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 0.0 <br />0.0 <br />%its BackOfQ(50%),veh/Ir4.7 <br />4.7 <br />16.2 <br />4.7 <br />0.2 <br />0.0 <br />0.2 17.3 <br />0.6 <br />LnGrp Delay(d),s/veh 37.3 <br />37.3 <br />64.9 <br />54.1 <br />0.6 <br />0.0 <br />109.8 25.3 <br />13.3 <br />LnGrp LOS D <br />D <br />E <br />D <br />A <br />F C <br />B <br />Approach Vol, veh/h 465 <br />465 <br />1321 <br />1488 <br />Approach Delay, s/veh 54.0 <br />54.0 <br />6.8 <br />25.2 <br />Approach LOS D <br />D <br />A <br />C <br />5 <br />Assigned Phs 1 <br />2 <br />4 <br />5 <br />6 <br />Phs Duration (G+Y+Rc), 94.3 <br />72.0 <br />23.7 <br />14.2 <br />62.1 <br />Change Period (Y+Rc), s 4.0 <br />4.0 <br />4.0 <br />4.0 <br />4.0 <br />Max Green Setting (Gma)4,,.B <br />63.0 <br />21.0 <br />14.0 <br />53.0 <br />Max Q Clear Time (g_c+l p,l <br />2.0 <br />19.3 <br />10.2 <br />36.4 <br />Green Ext Time (p -c), s 0.0 <br />39.8 <br />0.3 <br />0.1 <br />14.4 <br />Intersection Si <br />HCM 2010 Ctrl Delay <br />21.9 <br />HCM 2010 LOS <br />EI Camino Real Corridor Plan Synchro 8 Report <br />AM Peak Hour Existing Conditions W -Trans <br />HCM 2010 Signalized Intersection Summary <br />6: EI Camino Real & Roosevelt Ave <br />-'* -,* *\ T L!1 <br />EBL �[NBT SBU SBT SBR <br />Lane Configurations <br />) <br />r <br />) rt <br />A t+ <br />r <br />Traffic Volume (veh/h) <br />137 <br />168 <br />213 1382 <br />14 1218 <br />100 <br />Future Volume (veh/h) <br />137 <br />168 <br />213 1382 <br />14 1218 <br />100 <br />Number <br />7 <br />14 <br />5 2 <br />6 <br />16 <br />Initial Q (Qb), veh <br />0 <br />0 <br />0 0 <br />0 <br />0 <br />Ped -Bike Adj(A_pbT) <br />1.00 <br />1.00 <br />1.00 <br />34.9 <br />0.92 <br />Parking Bus, Adj <br />1.00 <br />1.00 <br />1.00 1.00 <br />1.00 <br />1.00 <br />Adj Sat Flow, veh/h/In <br />1863 <br />1863 <br />1863 1863 <br />1863 <br />1863 <br />Adj Flow Rate, veh/h <br />140 <br />171 <br />217 1410 <br />1243 <br />102 <br />Adj No. of Lanes <br />1 <br />1 <br />1 2 <br />2 <br />1 <br />Peak Hour Factor <br />0.98 <br />0.98 <br />0.98 0.98 <br />0.98 <br />0.98 <br />Percent Heavy Veh, % <br />2 <br />2 <br />2 2 <br />2 <br />2 <br />Cap, veh/h <br />230 <br />205 <br />248 2797 <br />2161 <br />890 <br />Arrive On Green <br />0.13 <br />0.13 <br />0.28 1.00 <br />1.00 <br />1.00 <br />Sat Flow, veh/h <br />1774 <br />1583 <br />1774 3632 <br />3632 <br />1458 <br />Grp Volume(v), veh/h <br />140 <br />171 <br />217 1410 <br />1243 <br />102 <br />Grp Sat Flow(s),veh/h/lnl774 <br />1583 <br />1774 1770 <br />1770 <br />1458 <br />Q Serve(g_s), s <br />7.5 <br />10.5 <br />11.7 0.0 <br />0.0 <br />0.0 <br />Cycle Q Clear(g_c), s <br />7.5 <br />10.5 <br />11.7 0.0 <br />0.0 <br />0.0 <br />Prop In Lane <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Lane Grp Cap(c), veh/h <br />230 <br />205 <br />248 2797 <br />2161 <br />890 <br />VIC Ratio(X) <br />0.61 <br />0.83 <br />0.88 0.50 <br />0.58 <br />0.11 <br />Avail Cap(c a), veh/h <br />302 <br />269 <br />373 2797 <br />2161 <br />890 <br />HCM Platoon Ratio <br />1.00 <br />1.00 <br />2.00 2.00 <br />2.00 <br />2.00 <br />Upstream Filter(I) <br />1.00 <br />1.00 <br />0.85 0.85 <br />1.00 <br />1.00 <br />Uniform Delay (d), s/veh 41.1 <br />42.5 <br />35.2 0.0 <br />0.0 <br />0.0 <br />Incr Delay (d2), s/veh <br />2.6 <br />15.6 <br />12.2 0.6 <br />1.1 <br />0.3 <br />Initial Q Delay(d3),s/veh <br />0.0 <br />0.0 <br />0.0 0.0 <br />0.0 <br />0.0 <br />%ile BackOfQ(50 % ),veh/Ir8.8 <br />9.7 <br />6.5 0.2 <br />0.3 <br />0.1 <br />LnGrp Delay(d),s/veh <br />43.7 <br />58.0 <br />47.4 0.6 <br />1.1 <br />0.3 <br />LnGrp LOS <br />D <br />E <br />D A <br />A <br />A <br />Approach Vol, vehlh <br />311 <br />1627 <br />1345 <br />Approach Delay, s/veh <br />51.6 <br />6.8 <br />1.1 <br />Approach LOS <br />D <br />A <br />A <br />9118/2017 r <br />EI Camino Real Corridor Plan 9/18/2017 PM Peak Hour Existing Conditions Synchro 9 Report <br />W -Trans Page 8 <br />4 <br />5 <br />6 <br />Assigned Phs <br />2 <br />4 <br />5 <br />6 <br />Phs Duration (G+Y+Rc), s <br />83.0 <br />17.0 <br />18.0 <br />65.1 <br />Change Period (Y+Rc), s <br />4.0 <br />4.0 <br />4.0 <br />4.0 <br />Max Green Setting (Gmax), s <br />67.0 <br />17.0 <br />21.0 <br />50.0 <br />Max Q Clear Time (g_c+ll ), s <br />2.0 <br />12.5 <br />13.7 <br />2.0 <br />Green Ext Time (p -c), s <br />42.9 <br />0.4 <br />0.3 <br />34.9 <br />Intersection Summary <br />HCM 2010 Ctrl Delay <br />8.7 <br />HCM 2010 LOS <br />EI Camino Real Corridor Plan 9/18/2017 PM Peak Hour Existing Conditions Synchro 9 Report <br />W -Trans Page 8 <br />