My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-12-04 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-12-04 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2017 8:54:28 AM
Creation date
11/30/2017 4:16:55 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/4/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.2.A. - Page 1 <br />REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br />December 4, 2017 <br />SUBJECT <br />Final Acceptance —Bair Island Storm Drain Pump Station Project <br />RECOMMENDATION <br />By motion, accept the Bair Island Storm Drain Pump Station Project, and authorize the <br />release of bonds and the retention according to City procedures <br />BACKGROUND <br />On January 27, 2014, the City Council approved the Award of Contract for the Bair <br />Island Storm Drain Pump Station (BISDPS) Project, to build a new storm drain pump <br />station and demolish the existing storm drain pump station. The capacity of the pump <br />station was increased to handle the storm water flows from a 100 year" storm event (a <br />rain event that has a 1 % probability of occurring each year). Additionally, the new pump <br />station location is more compatible with the traffic circulation planned for the area, which <br />includes the newly constructed roundabout on Bair Island Road and a future vehicular <br />bridge from Bair Island Road to Blomquist Street. <br />ANALYSIS <br />The contract was awarded for a base bid of $1,913,000.00 to Sanco Pipelines, Inc. of <br />Los Gatos, CA. The project was successfully completed in accordance with the plans <br />and specifications. Change orders were issued totaling $93,412.15. The final contract <br />amount is $2,006,412.15, which is 4.88% more than the initially awarded contract <br />amount. Change orders were due to unforeseen field conditions that resulted in <br />additional work that was not within the original scope of work, but was necessary to <br />complete the project. Construction was temporarily suspended for more than two years <br />until a sanitary sewer force main operated by Silicon Valley Clean Water (SVCW), <br />which within the immediate vicinity of the BISDPS project site, could be deactivated by <br />SVCW. <br />
The URL can be used to link to this page
Your browser does not support the video tag.