My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2005-08-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2005
>
AgdaPkt 2005-08-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2005 2:44:54 PM
Creation date
8/18/2005 2:58:46 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
8/22/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ /ð-/.:e <br /> <br />1.4.2 Cost Estimating Methods <br /> <br />The costs for customer site retrofits in the 2002 Feasibility Studies were estimated to be a <br />percentage of total recycled water project costs. The City Council subsequently adopted a "No <br />Mandatory Use" policy which significantly changed the predictability of converting large <br />residential landscape meters to recycled water in a scheduled, sequential process. The method <br />for estimating customer site retrofits costs was then revised to be based on the individual site <br />retrofits spread across a much longer period of time, which resulted in a substantial increase in <br />professional services and labor throughout the process (including a need to develop and deploy <br />a marketing effort for recycled water to potential commercial customers). <br /> <br />While the cost estimate was being refined, the City began incorporating additional costs that <br />had not been included in previous cost estimates. Among these are direct costs to the City (Le., <br />City staff costs) and planning costs associated with environmental review, revised feasibility <br />studies, project financing costs I bond market conditions, public information, and extended <br />program management services. <br /> <br />1.4.3 <br /> <br />Cost Escalation Over Time <br /> <br />The refined project cost estimates have been compiled to reflect a multi-phased and longer <br />construction schedule and all costs have been escalated into the mid point of construction of <br />each phase or discrete project. This significantly increased the estimated cost of the project. <br />The 2002 Water Recycling Feasibility Studies and Alternative TF cost estimates were planning <br />level costs, were based on total project cost in 2002 dollars, and did not account for project <br />phasing or projection of costs into the future. The original timeline for project planning, <br />acceptance and construction has grown by approximately two years: Thus, duration and timing <br />of construction are essentially double-driving cost escalation. <br /> <br />1.4.4 <br /> <br />Volatility in Construction Industry <br /> <br />Unit costs of construction materials have increased dramatically since 2002. Volatile market <br />trends over the past three years for products such as steel, concrete and petroleum-based <br />pipeline materials (such as PVC) have resulted in substantial cost increases in the City's <br />recycled water project. The costs for these materials have increased from 100% to 200+% in a <br />two-year period. Intensive construction in the Bay area, such as the Bay Bridge and other <br />highway improvements, have further escalated prices due to reduced availability of, and <br />increased competition for, limited goods and services capacity. The cost increases for this <br />factor are combined with cost increases for project design changes (described above) due to <br />the complexity of trying to quantify the two factors separately. <br /> <br />1.4.5 Creating Certainty in Cost Estimates <br /> <br />During the process of reviewing the draft Progress Report with members of the Task Force, it <br />became increasingly clear that everyone - Task Force and project team alike - is concerned <br />about containing the cost of the project over time and creating a degree of certainty about the <br />long-term economic outcomes. The project team will strive to keep expenditures within the <br />parameters of the Water Financing Plan - 2004 Update, approved by the City Council in <br />January 2004, and to engage the Task Force in discussions, should this goal be challenged as <br /> <br />Redwood City Recycled Water Project <br />Progress Report 2005 <br />Redwood City Recycled Water Task Force Recommendations - Final Report <br />p:\pw-proj\2004\0468025 I'M: recycled retofit & support svoltas!< 11 program supportltas!< force status report\final reportlprogre.. report on tl recommendationsJinaLdoc <br /> <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.