<br />6:/ð- /,& <br /> <br />the project moves forward. Recognizing that the bidding environment for large public works <br />projects is becoming increasingly unpredictable, the project team has implemented the following <br />cost control and review measures to ensure project costs receive an appropriate degree of <br />consideration throughout design and bidding: <br /> <br />. A joint review by the City and SBSA has been integrated into the design process to ensure <br />project scope and costs are within the parameters established by the project team at the <br />preliminary and final design levels. <br />. A professional construction manager will conduct an independent cost estimate and <br />constructability review for each design package. <br />. The project's Program Manager will perform a peer review of the pipeline cost estimates. <br /> <br />Redwood City Recycled Water Project <br />Progress Report 2005 <br />Redwood City Recycled Water Task Force Recommendations - Final Report <br />p:lpw-proj\2004\0468025 rwc recycled relrofit & support svcltasl< 11 prog-am support\task force status report\final report\progfess report on tl recommendationsjinal.doc <br /> <br />Page 5 <br />