Laserfiche WebLink
TIME SCHEDULE <br />Consultant shall meet the scheduling requirements as described in the Scope of Work <br />and the scheduling milestones as follow: <br />Site Reconnaissance of metering sites: <br />December 4, 2017 <br />Documentation of Field Reconnaissance: <br />December 6, 2017 <br />Approval of Sites by City (if changes are required): <br />December 8, 2017 <br />Meters and rain gauges installed and operating: <br />December 11, 2017 <br />First data batch reported to City: <br />December 22, 2017 <br />Meters Removed: <br />February 12, 2018 <br />Flow Monitoring Report to the City: <br />March 5, 2018 <br />The removal of the flow meters and the submission of the final report may be delayed if <br />the City extend the flow monitoring period. Report will be Final upon acceptance by the <br />City. <br />FEE SCHEDULE <br />City shall pay the consultant the following amount to install six (6) flow monitoring <br />meters and minimum of one (1) rain gauges for 60 days period and an option to extend <br />the flow monitoring period to up to one month as follows: <br />A. Direct Fixed Costs <br />Field Reconnaissance / Document Review / Wet Weather Flow Monitoring / Data <br />Analysis and Flow Monitoring Report--------------------- $36,000.00 <br />B. Optional Costs (not part of fixed cost) <br />Weekly extensions of flow meters and rain gauge, if required, shall be provided by <br />consultant for the additional amount of $1,000.00 per week for up to four (4) weeks----- <br />--------------------------- $4,000.00 <br />TOTAL CONTRACT AMOUNT (including additional one month period of flow <br />monitoring in addition to the 60 days specified if required.) --------- $40,000.00 <br />REV: 11-28-17 PR <br />Page 11 of 11 <br />ATTY/AGR.2017.280N & A Consulting Engineers, Inc. <br />