My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 BKF Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2009 12:35:14 PM
Creation date
8/22/2005 11:03:51 AM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Belmont Slough outfall improvement
RMP File Number
304
Date
8/12/2005
MO Ref
05-149
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT \I A II <br />Be..j1ont Siouah Pump Station En~..leerina <br /> <br />Hours by Task <br /> <br />BKF Engineers <br />540 Price Ave <br />Redwood City Ca 94063 <br /> <br />TASKSIWORK SCOPE <br /> <br /> Senior Proj Engineer Structural & <br />TOTAL Principal Manager III Electrical Phase <br />HOURS Hrs Hrs Hrs Engineers Totals <br /> $167.00 $140.00 $116.00 $138 <br /> <br />PHASE I. PRELIMINARY ENGINEERING AND DESIGN DEVELOPMENT REPORT <br /> <br />_T¡_sk 1 m.Qesign_[)~v_elo)lT1l!l1t IDe!ilÐ-" Report <br />1 ,01_Heview ~f.existing drawings 13_nd r:ef'()Iis - <br />1,0~_FinaliZEJ.f>.ump selection_- - -- <br />1,():!- Optimize pump dischargE!.pipe si2:e~nd material <br />_1,04 Evaluate pump control_- <br />- -- 1.0tj...£'repare preliminary project c()st~tirT1at~ <br />- _1,()6 M.E'eting witi"1 City staff to review fir1ding~ <br />1.07- Prepare b_riefdesign report -- <br />1,Q.8.- Inc(Jrporate City comments_and prepare final letter report <br />1,09 Administration including weekly project log <br /> <br /> <br />----- <br /> <br />PHASE II. CONSTRUCTION DOCUMENTS PREPARATION - PUMP STATION <br /> <br />Tas_k 2 --~/. Design Phase -- -- - -- <br />--.1..01 Set-up sheets layout elements of pump station - <br />___1.:02 Finalize pump, disc;hargepif'eline, and mechanical plan_- <br />2.03_Control and electrical system desig_n____- <br />___2.04 Existing outletstructural analysis and pump support design <br />:l~repare outline specification -- <br />2.06- Design team revi¡¡w meeting_- ---- <br />_~~07 City meeting during 50% design I'h~ <br />__~.08 Coordination with PG&E for pow!!r servi~- <br />~- Preparation of submittal package - <br />- _~10 Administration inclucjing weekly project log - <br /> <br />Task 2 Subtotal <br /> <br />Task_:l..~_5% Design Phase - - <br />- _..lJJ_1 Incorporate 50%_City revie", comm_ents_- <br />3:2.z..£ump station design elements__- <br />-______3.03- Pumpstationstructuredesign ------ <br />--- 304- Control and electrical system desi9"...... .-- <br />--- _3.05 Completion of specificati<Jf1...... - --- - <br />- -- 3.06....§ic1. scheduleand final design drawing preparation__- <br />3,QZL_andscapingfor pumpstationsite - not included -- <br />--- 3.08 Prepare project cost estil11¡¡t¡¡ <br />---- 3.09 Design team meetings- j\ssume 2- <br />-~O City meeting during 95% design pi"1ase - Assume .1...- - <br />3. !1....f.oordinatic>nwith PG&E for p~wer service....- <br />-- 3J 2 Preparation of submittal package <br />_1.13 Administratic>nJncluding weekl}'.e.roject log <br /> <br />---- ---- <br /> <br />Task 3 Subtotal <br /> <br />Task_4 - 100% Design .J>.hase un - <br />- - _4,01 Incor¡Jorate 95"10 City review comme~- <br />_4.02 Asse_mble bid pack~_- <br />4J1.~Final sLJt¡mittal t() City- <br /> <br />Task 4 Subtotal <br /> <br />_.J>.l1ase 1iC:.<>.nstrll<:tionDocument Preparation - Subtotal <br />~.l!Õ.mbu"sill>le Bud~.! <br />Phase II Construction Document Pre aration - Total <br /> <br />Project Total (Phase I and Phase II) <br /> <br />20 12 4 4 S j2_,696 <br />6 6 $840 <br />10 6 4 _~1,304- <br />20 2 18 S/E __F,764 <br />6 4 Z. $792 <br />4 4 $560 <br />20 6 8 6 E $2,596 <br />24 12 8 4 ß160 <br />4 1 2 1 $563 <br />114 1 54 27 32 $15,275 <br /> $200 <br /> $15,475 <br /> <br />12 <br />48 <br />32 <br />--- <br />44 <br />28 <br />6 <br />6 <br />6 <br />8 <br />5 <br />195 <br /> <br />2 <br />8 <br />4 <br />4 <br />2 <br />2 <br />4 <br />2 <br />2 <br />4 <br />34 <br /> <br />4 S/E $1,296 <br />2 S/E $1_,484 <br /> $447 <br />6 $3,227 <br />147 46¿i8 <br /> $500 <br /> $47,048 <br /> $62,523 <br /> <br />10 <br />40 <br /> <br />4 <br />8 <br />4 <br /> <br />28 E <br />36 S <br />18 SIE <br /> <br />$1,440 <br />$5,760 <br />_ji,424. <br />:g;,992 <br />i3,692 <br />$744 <br />--- -- <br />$894 <br />$832 <br />$1,064 <br />$727 <br />$25,569 <br /> <br />.$}88- <br />n_- $1,488 <br />$2,400 <br />$1,936 <br />___$3,704 <br />__$2,320- <br />$0 <br />$1,064 <br />_$1,0~ <br />$560 <br />$556 <br />~18 <br />$894 <br />$17,752 <br /> <br />Note: This Engineering proposal shall be completed in four months after the Notice to Proceed is issued by the City . <br /> <br />2 <br /> <br />1 <br />3 <br /> <br />6 <br />12 <br />18 <br />14 <br />28 <br />18 <br />0 <br />8 <br />8 <br />4 <br />4 <br />8 <br />6 <br />134 <br /> <br />2 <br />4 <br />2 <br />2 <br />8 <br />6 <br /> <br />2 <br />2 <br /> <br />2 <br />4 <br />4 <br />2 <br />1 <br />4 <br />41 <br /> <br />10 <br />12 <br />3 <br />25 <br /> <br />2 <br />2 <br />2 <br />6 <br /> <br />1 <br />1 <br /> <br />354 <br /> <br />6 <br /> <br />81 <br /> <br />Abbreviations: E- Electrical Engineer and Control - MTH, S - Structural - PRSE <br /> <br />U:Iproject CorrespondencelBelmont Slough Outfal~Hevised fee- hour psproposal.x1stmtlginal Proposal <br /> <br />---- -- <br /> <br />2 <br /> <br />4 E <br />4 S/E <br /> <br />68 <br /> <br />90 <br /> <br />2 2 S/E <br />8 <br />-- --- <br />4 12 S <br />12 E <br />12 S/E <br />4 S/E <br /> <br />8 <br />8 <br /> <br />2 <br />4 <br /> <br />4 S/E <br /> <br />4 <br /> <br />2 E <br />3 E <br /> <br />40 <br /> <br />51 <br /> <br />4 <br />8 <br /> <br />12 <br /> <br />120 <br /> <br />7/14/2005 <br /> <br />-- To <br />
The URL can be used to link to this page
Your browser does not support the video tag.