Laserfiche WebLink
<br />1. Incorporate 50% City review comments <br />2. Pump station design elements <br />3. Pump station structure design <br />4. Control and electrical system design <br />5. Completion of specifications <br />6. Bid schedule and final design drawing preparation <br />7. Landscaping for pump station site - not included <br />8. Prepare final project cost <br />9. Design team meetings - (Assume 1) <br />10. City meeting during 95% design phase - (Assume 1) <br />11. Coordination with PG&E for power service <br />12. Preparation of submittal package <br />13. Administration including weekly project log <br /> <br />Deliverables: <br />. A 95% plan set including complete pumps, discharge pipeline and structural details <br />. Complete pump control plans <br />. Complete project specification package <br />. Engineers cost estimate <br />. Bid schedule <br /> <br />Task 4 - 100% Design Phase <br /> <br />Final review comments from the City will be incorporated into the plans to produce the final plan <br />set that will be ready for bidding. <br /> <br />1. Incorporate 95% City review comments <br />2. Assemble bid package <br />3. Final submittal to City <br /> <br />Deliverables: <br />. A 100% plan set and specifications including complete pump station and structural <br />details <br /> <br />The Scope of Work listed above will provide the City of Redwood City with construction <br />documents for converting one chamber ofthe existing outlet structure to a pump station. Work not <br />included in our scope includes pump station environmental study, pennit application, and assistance <br />during the bidding process and constructions administration during construction. These services <br />can be provided if needed by the City. <br /> <br />"~.,_.."~. '"r-" <br />