My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 BKF Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2009 12:35:14 PM
Creation date
8/22/2005 11:03:51 AM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Belmont Slough outfall improvement
RMP File Number
304
Date
8/12/2005
MO Ref
05-149
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1. Incorporate 50% City review comments <br />2. Pump station design elements <br />3. Pump station structure design <br />4. Control and electrical system design <br />5. Completion of specifications <br />6. Bid schedule and final design drawing preparation <br />7. Landscaping for pump station site - not included <br />8. Prepare final project cost <br />9. Design team meetings - (Assume 1) <br />10. City meeting during 95% design phase - (Assume 1) <br />11. Coordination with PG&E for power service <br />12. Preparation of submittal package <br />13. Administration including weekly project log <br /> <br />Deliverables: <br />. A 95% plan set including complete pumps, discharge pipeline and structural details <br />. Complete pump control plans <br />. Complete project specification package <br />. Engineers cost estimate <br />. Bid schedule <br /> <br />Task 4 - 100% Design Phase <br /> <br />Final review comments from the City will be incorporated into the plans to produce the final plan <br />set that will be ready for bidding. <br /> <br />1. Incorporate 95% City review comments <br />2. Assemble bid package <br />3. Final submittal to City <br /> <br />Deliverables: <br />. A 100% plan set and specifications including complete pump station and structural <br />details <br /> <br />The Scope of Work listed above will provide the City of Redwood City with construction <br />documents for converting one chamber ofthe existing outlet structure to a pump station. Work not <br />included in our scope includes pump station environmental study, pennit application, and assistance <br />during the bidding process and constructions administration during construction. These services <br />can be provided if needed by the City. <br /> <br />"~.,_.."~. '"r-" <br />
The URL can be used to link to this page
Your browser does not support the video tag.