My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC17-18 0107 PC Reso Approving Downtown Plan Community Permit - 707 Bradford
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2017
>
Reso PC17-18 0107 PC Reso Approving Downtown Plan Community Permit - 707 Bradford
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2017 8:10:55 AM
Creation date
12/18/2017 8:09:33 AM
Metadata
Fields
Template:
CC Index
Meeting Type
Regular
Agency Type
Planning Commission
Date
12/5/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
33. Undergrounding Utilities - The applicant shall underground all overhead <br />utilities along building frontage on Bradford Street up to the nearest existing <br />pole, which shall be shown on the building permit plans. SDR [ENGINEERING] <br />34. Sewer Capacity — Prior to encroachment permit issuance, submit to the City, <br />and obtain approval of, an evaluation and report prepared by a licensed <br />engineer demonstrating that the existing sewer mains have sufficient capacity <br />for the project. The study shall consider existing, project, other approved <br />projects, and applications currently under review in determining the needed <br />capacity. If the existing sewer main is less than 6" in size, or is in any other way <br />not sufficient as determined by the City Engineer, applicant shall, as part of the <br />Project, construct and install new sewer mains sufficient to meet such <br />requirements, in accordance with the City's Engineering standards and as <br />directed by the City Engineer to the City Engineer's satisfaction. <br />[SDRI[ENGINEERING] <br />35. Peak Wet Weather Flow Capacity — Redwood City has exceeded its Peak <br />Wet Weather Flow (PWWF) capacity in the past. A methodology to reduce <br />inflow and infiltration (1/1) by pipe replacement was determined. The applicant <br />shall reduce (1/1) to offset increased sewer demand from the project by replacing <br />aged sewer mains or pay an equivalent in -lieu fee. The length of pipe <br />replacement required or the amount of fee will be based on the project's sewage <br />generation projection (Attachment L of the City's Engineering Standards). For <br />parcels within Redwood City but connecting to County owned and maintained <br />sewer, an 1/1 in -lieu fee may be collected by Redwood City if the County does <br />not require main replacement or collect and in -lieu fee. [COA][ENGINEERING] <br />36. Sewer Lateral Limit — The project is limited to one sewer lateral per parcel. <br />[COA][ENGINEERING] <br />37. Sewer Lateral Size for Commercial Development - For new or remodeled <br />commercial buildings, sewer laterals less than 4" shall be upgraded to a <br />minimum 6" size. [SDR] [ENGINEERING] <br />38. Water Mains — Prior to encroachment permit issuance, submit to City, and <br />obtain approval of, an evaluation and report, prepared by a licensed engineer, <br />in conformance with the City's Engineering Standards, demonstrating that the <br />proposed water main meets the domestic and fire flow requirements in <br />accordance with City Code Section 38.26 and the International Fire Code. If the <br />existing water main is less than 6" in size, or is in any other way not sufficient <br />as determined by the City Engineer, applicant shall, as part of the Project, <br />construct and install new water mains sufficient to meet such requirements, in <br />accordance with the City's Engineering Standards and as directed by the City <br />Engineer. New water mains shall be 8" minimum in size and extend across the <br />entire property frontage, from the nearest point of connection to an existing 6" <br />or larger water main.[SDR][ENGINEERING] <br />ATTY/RESO.0107/PC RESO APPROVING DOWNTOWN PLAN COMMUNITY PERMIT -707 BRADFORD <br />REV: 12-01-17 PR <br />Page 13 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.