Laserfiche WebLink
39. Water Meters — The project is limited to one "master" water meter for domestic <br />water service. Any metering for individual units must be accomplished by <br />private sub -meters within the property. [COA][ENGINEERING] <br />40. Recycled Water Facilities — Recycled water (purple pipe) facilities shall be <br />provided and designed in accordance with Engineering Standards for dual <br />plumbing, irrigation, and other warranted uses per the Recycled Water <br />Ordinance, Chapter 38. Services that are to be supplied by recycled water <br />(either at the time of project completion or at a future date) shall be designed to <br />properly function at the design pressure required by Engineering. Upon a final <br />determination by the City that recycled water is available for the property, the <br />applicant shall connect the project to the recycled water system. <br />[SDR][ENGINEERING] <br />41. Recycled Water Report - The applicant shall hire an engineer licensed in <br />California and experienced in the field of wastewater treatment to prepare a <br />recycled water report for dual plumbed facilities, pursuant to California Water <br />Code section 13522.5 and in accordance with California Code of Regulations <br />sections 60314 and 60323 (found within Title 22, Division 4, Chapter 3). The <br />report shall be submitted prior to project closeout, and will be routed to the <br />Public Works Department for review and coordination. It is recommended a <br />draft of the report is prepared prior to commencing any plumbing work to <br />prevent the need for unplanned changes. [COA] [ENGINEERING] <br />42. Cross -Connection Control Test - Prior to issuance of the certificate of <br />occupancy, all applicable plumbing systems must pass a cross -connection <br />control test, performed by a Cross -Connection Control Specialist Certified <br />through the CA -NV Section of the AWWA and observed by Public Works staff. <br />The cross -connection control test method must be included in the Recycled <br />Water Report. The applicant is responsible for all fees associated with the <br />performance of the cross -connection control test. [COA] [ENGINEERING] <br />43. Backflow Protection — Backflow protection on all water services is required. <br />The backflow preventer shall be above grade and located on private property, <br />accessible to the Public Works division for testing. [COA][ENGINEERING] <br />44. Fire Flow - The Project shall meet fire flow requirements as established by the <br />Fire Department which are based on the Fire Code. Fire flow tests are typically <br />performed during the preliminary design phase but must be completed prior to <br />submittal of final design. Applicant shall contact the Fire Department forfire flow <br />requirements, and then submit a written fire flow test request to Engineering. <br />[COA][ENGINEERING] <br />45. C3 Requirements - Plans shall be designed to meet C3 requirements of the <br />Municipal Regional Permit (MRP) NPDES Permit CAS612008 and be in <br />ATN/RESO.0107/PC RESO APPROVING DOWNTOWN PLAN COMMUNITY PERMIT -707 BRADFORD <br />REV: 12-01-17 PR <br />Page 14 of 23 <br />