Laserfiche WebLink
shall be as determined by the City Landscape Architect. <br />[SDRI[ENGINEERING] <br />50. Repair or Replace Street Infrastructure - Restore streets surrounding the <br />project site to the satisfaction of the City Engineer at project completion. At a <br />minimum, this would include crack sealing, spot repair, and installation of a <br />slurry seal the full width of Bradford street, along the project frontage. If <br />additional pavement restoration is needed, the Engineer shall approve the <br />preferred layout of pavement markings. [SDR][ENGINEERING] <br />51. Parking Garage Ramps - Parking garage ramps shall meet the Design Criteria <br />of the Engineering Standards and consider safety and visibility of pedestrians <br />to the satisfaction of the City Engineer. Access controls shall be designed and <br />placed in such a way that vehicles do not block the public sidewalk or queue in <br />the public right-of-way. The access control system shall be delineated in the <br />building permit submittal. Person doors with panic hardware and alarms shall <br />be installed at or adjacent to gates between private and public parking to allow <br />the safest emergency egress path of travel. [SDR][ENGINEERING] <br />52. Shoring for Excavations β€” No tiebacks shall extend into the public right of way <br />or onto adjacent properties without the written agreement of the City and/or <br />private property owner. Any tie -backs within the City's right of way shall be de - <br />tensioned prior to permit sign -off and/or project acceptance. [COA] <br />[ENGINEERING] <br />Fire and Safetv <br />53. High Rise Determination β€” As this structure is proposed to be seven stories <br />in height, measurement of the highest occupied floor level in relation to the <br />lowest point of fire department vehicular access at the curb must be made. If <br />this measurement is 75 feet or greater, the building shall be determined to be a <br />high rise and therefore would need to meet all of the requirements of such. <br />[SDR] [FIRE] <br />54. Emergency Responder Radio Communications System - This project is <br />required to have an Emergency Responder Radio Communications System <br />(ERRCS) installed in accordance with CFC 510. [SDR] [FIRE] <br />55. Fire Alarm System Required β€” UL Central Station fully addressable fire alarm <br />system is required in the building and garage meeting NFPA 72. Provide plans <br />and voltage drop calculations for the design of these systems. [SDR] [FIRE] <br />56. Addressing and Access β€”The following requirements apply: [COA][FIRE] <br />a. Addresses must be logical, sequential numbers, i.e. First Floor 101, 102, <br />103, Second Floor 202, 203, 204, as opposed to F303, G401, etc. <br />ATTY/RESO.0107/PC RESO APPROVING DOWNTOWN PLAN COMMUNITY PERMIT -707 BRADFORD <br />REV: 12-01-17 PR <br />Page 16 of 23 <br />