Laserfiche WebLink
<br />Environmental <br />Science <br />Associates, Inc. <br /> <br />;111 H"1I1Iidll Sllù'l <br />-"(Ilk 21111 <br /> <br />-"dll ¡"'III("','. <br /> <br />( 'alil""1>" <br />'14 1117 I X II <br />III" I X9(¡~.,911() <br />1.\\ XI)h-IIU2 <br /> <br />¡ '" \II~{'¡{'\ <br /> <br />',i, <br /> <br /> <br />EXHIBIT "A" <br /> <br />II <br /> <br />Ir;)) <br />..,,\ <br />, nJ' <br />: ,.~~, <br />;.'. .Ii i '. :~. ":°91 . <br />',; \..'~, .J.J I <br /> <br />I", "F REr-I',;¡ """"0 <br />i-"~ U',- 'l, n' ,-j 0 C I Ti i <br />U:J\!Ç~jf~EERING DIVISION! <br /> <br />Œ@ŒOWŒ ill) <br /> <br />July 2, 1991 <br /> <br />Mr. Peter Vorametsanti <br />Project and Systems Engineer <br />City of Redwood City, Engineering Department <br />1017 Middlefield Road <br />Redwood City, CA 94064 <br /> <br />Dear Mr. Vorametsanti: <br /> <br />We are pleased to respond to your request for environmental services for assistance in <br />the preparation of CEQA documentation for levee upgrades being proposed by <br />Redwood City in the vicinity of Redwood Shores. On the basis of our discussion on <br />June 26th, we have prepared the following description of the general work tasks that' <br />would be necessary to provide the needed services. <br /> <br />GENERAL WORK TASKS <br /> <br />1. <br /> <br />Initial Background Review <br /> <br />ESA will meet with the City, and if appropriate the City's consultants and Redwood <br />Shores, Inc., to review all available infonnation regarding the levee project and the <br />proposed site. We will conduct a cursory field reconnaissance to better acquaint <br />ourselves with the site and assess the need for funher site investigation. <br /> <br />2. <br /> <br />Prepare Initial Study <br /> <br />ESA will assess the environmental impacts of the levee project and prepare an Initial <br />Study. This assessment will include reviewing the Initial Study checklist and <br />discussion of topics for which a "Yes" or "Maybe" response seems appropriate. We <br />have identified the following potential issues: <br /> <br />Describe changes or disruptions that might occur in geo10gic/seismologic <br />conditions due to the proposed project, including a discussion of erosion <br />and sedimentation or siltation changes. <br /> <br />Describe changes that might occur in air quality due to the proposed <br />project. This assessment will include a general discussion of odors and any <br />changes in air movement, moisture, or temperature. <br /> <br />Describe any changes in water quality and hydrology that might occur as a <br />result of the proposed project. Both surface waters and groundwater will be <br />addressed. ESA understands that the surface water issue is particularly <br />important because of the existence of wetlands in the vicinity of the <br />proposed project. <br /> <br />ESA <br /> <br />,.. ----,-,----,---,,--------,,------,-,,'--'----'-'----'-' <br />