Laserfiche WebLink
<br />PROJECT APPROACH <br /> <br />FINAL EDITING AND QUALITY CONTROL <br /> <br />GEO CADD SURVEYS has written lisp routines and batch files to aid in the quality <br />control process. A computer routine will insure features and symbols are on their <br />correct layers. Extraneous vertices in polylines will be weeded and all polylines will be <br />continuous as possible. A TIN (triangulated irregular network) will be produced to <br />validate the three dimensional data. Stereo model records will be maintained and <br />stereo models will be checked by a supervisor for accuracy and completeness. Check <br />plots will be made before the final file is produced. <br />Once all data is acceptable, we will produce the final Autocad Release 12 DWG files on <br />3 1/2" diskettes. We will supply the spot elevations as "Softdesk points". <br />GEO CADD SURVEYS has a commitment to delivering the project on time and in <br />budget. Weather permitting the capture of aerial photography and ground control, <br />final deliverables should be furnished 8-9 weeks from notice to proceed. <br /> <br />Page 2 of 3 <br />