Laserfiche WebLink
Exhibit B <br /> r 1, Execute the add traffic stop cammand using the Stop button on the main tooibar. <br /> 2. Populate data into all the fislds. <br /> 3. GEO validate the address. <br /> 4. Execute the save command. <br /> 5. Assign severai units to the call. <br /> 6. Ve�w the traffic stop using the Traf button on the main tooibar. <br /> 7. Add a new disposition to the call. <br /> 8. View the log for the stop. <br /> 9. View the call times. <br /> 10. Display the address on the maP. <br /> 11. Clear the call from the Browse Traffic Stop window. <br /> 12. Add another traffic stop using the call drop down menu from the main menu. <br /> 13. Poputate all fields. <br /> 14. GEO validate the address. <br /> 15. Execute the save command. <br /> 16. Assign several units to the call. <br /> 17. �ew the traffic stop using the Open Traffic window command in the call drop down menu ftom <br /> the main menu. <br /> 18. Add a new disposition to the call. <br /> 19. View the log for the stop. <br /> 20. View the call times. <br /> 21. Display the address on the map. <br /> 22. Convert the traffic call to a standard call. <br /> 23. Clear the call. <br /> .F�cpected Results <br /> Verify that you are able to add a traffic stop using the Stop button on the main toolbar as well as <br /> from the call drop down tist in the main menu.Verify that you are able to change the disposition and <br /> view the call log. Verify that you can display the address on the map. Verify that you are able to <br /> view call times and convert the traffic stop to a staodard call. Verify that you can clear the call irom <br /> the Browse Traffic Stap window. Verify the call and the assigned units are tracked in the Browser <br /> windows. Verify the call is recorded in the historical database. <br /> 4.5 Multiple Position Calls <br /> This test verifies that CAD dispatchers fram several CAD positions can handie a given call. <br /> Test Procedure <br /> 1. Add a new call from a given CAD position. <br /> 2. Modify call information from another position. <br /> 3. Add several units from a third CAD position. <br /> 4. Change the state of those units from all three positions. <br /> E�cpected Results <br /> Verify that the call and the units are properly tracked and that call and unit history show which <br /> position changed the status of the call and units for each change. <br /> 4.6 Pre-pianned Calls <br /> This test verifies that pre-planned calls can be setup and those calls will be displayed to a CAD user <br /> at the appropriate time. <br /> Test Procedure <br /> 1. Use the CAD General Edit moduie to setu two re- lanned ca�ls. Set u one call to be a dail <br /> LUCENT TECHNOLOGIES -PROPRIETARY <br /> Use Pursuant to Company Instructions � <br /> Revised: 03/17/99 Page 6 <br /> ._ _ __ _ ___ _ <br />