My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 Lucent Technologies
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 Lucent Technologies
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2012 3:10:50 PM
Creation date
8/31/2005 8:42:46 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Lucent Technologies
PROJECT NAME
CAD - RMS Mapping System agreement & software license
RMP File Number
304
Date
3/22/1999
Box
6001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit B <br /> ! Test Procedure <br /> 1. Add a new call. <br /> 2. Use the create OCA case number command to create the OCA number. <br /> Expected Resutts <br /> Verify the OCA case number has been created,is valid, and has been saved. <br /> 6.9 Compiaints <br /> This test verifies that the CAD dispatcher can view a list of complaint types fo�all current calls. It <br /> also verifies the dispatcher can change the complaint type for a given call. <br /> Test Procedure <br /> 1. Add several new calls for dispatching, each one with a different comptaint type. <br /> 2. View the fist of complaint types. <br /> 3. Modify a complaint type for one of the current catls. <br /> 4. Save the call. <br /> 5. Vew the list of complaint types agam. <br /> Expected Resuits <br /> Verify the list of complaint types matches the complairtt types entered when the calls were added. <br /> Verify the modified comptaint type shows up in the new list. <br /> 6.10 Refresh/Reset <br /> � This test verifies that refresh, and reset functions operate correctly. <br /> Test Procedure <br /> 1. Execute the reset comrnand. <br /> 2. Change a uniYs status from another position. <br /> 3. Execute the refresh command on the All Units window. <br /> 4. Execute the refresh command on the Units Assigned window. <br /> 5. Add a new call from another position. <br /> 6. Execute the refresh command on the All Calls windaw. <br /> Expected Results <br /> Verify the reset command causes all unit and call browser to be reset.Verify the refresh command <br /> picks up call and unit changes from other positions by rereading the database for their new status. <br /> 6.10 Intemal Response Area <br /> This test verifies that calls get assigned to the correct IRA and the CAD dispatcher can view the <br /> assigned IRA scenario far the call. <br /> Test Procedure <br /> 1. Add a new call for a valid address in the GEO database. <br /> 2. Vie�nr the IRA scenario for this cail. <br /> Expected Results <br /> Verify the IRA scenario is correct for the given address. <br /> LUCENT TECHNOLOGIES -PROPRtETARY <br /> Use Pursuant to Company Instructions � <br /> Revised: 03117/99 Page 15 <br /> . _.. _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.