Laserfiche WebLink
Redwood City Potice <br /> .�... <br /> Department Statement ofi Work <br /> '� 1.O INTRODUCTION- REDWOOD CITY SECTION <br /> This Statement of Work is a comprehensive document of deliverables <br /> required for integration of the Mobile Data System described in this proposal. <br /> This Statement of Work describes the tasks to be performed for the locations <br /> and connections between the Radio Network Controller,the two radio <br /> backbone sites and the mobile data devices. Additionally,the deliverables <br /> and tasks required for Foster City Police Department and Hillsborough Police <br /> Department will be listed in separate sections. The Statement of Work <br /> sections for Foster City Police Department and Hillsborough Police <br /> Department will be�andled through specific contracts individually to those <br /> agencies. However, it should be noted that operational functionality for those <br /> agencies will be dependent upon data system infrastructure completion of the <br /> Redwood City portion of the project <br /> �, Motorola presents this formalized document,the Statement of Work(SOV�, <br /> to suminarize the deliverables for the implementation scope of the contract <br /> This document may refer to information found elsewhere in the proposal, <br /> such as equipment lists,various drawings,time schedules,installation details, <br /> and other pertinent information detetmined relevant to the project. <br /> It is the intent of Motorola that this SOW be a negotiated document <br /> representing the most current understanding of the system design, operation, <br /> and architecture. Changes to this document will be made by formal request � <br /> by either party and subject to approval by the�other. An amendment process <br /> will be agreed to. <br /> The SOW will outline what work is involved in the Fixed Network <br /> Equipment(FNE)�installation,and mobile installations. The CAD and RMS <br /> scope of work descriptions are not part of ttus SOW and will be submitted <br /> separately by the selected CAD vendor: This SOW will describe installation <br /> requirements for Redwood City, Foster City and Hillsborough PD, and what <br /> Motorola takes responsibility for in the execution of the SOW. <br /> � <br /> QMOTOROLA • 4 -�1 <br /> . _.___ _.. _ . <br />