My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 Lucent Technologies
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 Lucent Technologies
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2012 3:10:50 PM
Creation date
8/31/2005 8:42:46 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Lucent Technologies
PROJECT NAME
CAD - RMS Mapping System agreement & software license
RMP File Number
304
Date
3/22/1999
Box
6001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Redwood City Police � <br /> Department Statement of Work <br /> � remedied by the responsible party. At the conclusion of system tests, <br /> � Motorola will prepare a system test report and submit it to Redwood City. <br /> 1.18 SYS'r�MAZVU�. <br /> Motorola will provide a System Manual containing all system specific <br /> design, as-built, and servicing information. This manual, in conjunction with <br /> the standard equipment manuals,provides the information required for <br /> maintenance, Puture upgrades, etc. <br /> 1.19 MAINTENANCE TRANSITION � <br /> Prior to project completion the Motorola Program Manager will initiate a <br /> maintenance transition meeting. During the maintenance transition meeting <br /> the selected maintenance organization,the Program Manager, and Redwood <br /> City will determine a plan to ensure smooth transition from project <br /> implementation completion to the maintenance warranty phase. A check list <br /> of predetermined maintenance quality points are reviewed by the Program <br /> Manager to ensure they are in place. The points include the System Manual <br /> and other documentation has been delivered to Redwood City and <br /> appropriate Motorola organizations, Training,Trouble Call Process, and <br /> maintenance responsibility matrix. <br /> _ _ <br /> � <br /> QMOTOROLA . 4' - �rJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.