Laserfiche WebLink
Redwood City Police <br /> Department Statement of Work <br /> ( Motorola will coordinate with Redwood City in the transfer and scheduling <br /> of vehicles for MDD installations. MDD instalis.vuill be done on site at <br /> Redwood City Police Department Redwood City shali provide facilities to <br /> accommodate NIDD installations to include adequate shelter,power, and <br /> enough room for two vehicles to be installed at the same time. <br /> 1.16 REDWOOD CTTY EQIJIPMENT RECEIVING AND T�tACKING <br /> RESPONSIBILITIES <br /> It is the responsibility of REDWOOD CITY to provide a secure azea for <br /> receipt of all equipment being shipped-�y Motorola and received by <br /> REDWOOD CITY. Upon receipt by REDWOOD CITY at the designated <br /> receiving location, equipment Transfer of Title vvill commence.The storage <br /> area required for the received equipment only needs to be temporary as the <br /> RF Backbone equipment will be moved to the sites and installed within a few <br /> days after receip� <br /> However, enough secure.storage space should be made available for the <br /> . subscriber equipment during the longer period of mobile equipment <br /> installations. REDWOOD CITY should designate an individual responsible <br /> for receipt of shipped equipment who will coordinate with the Motorola <br /> Program Manager in the inventory process and in tracking of equipment <br /> � Packing slips will be copied and filed by REDWOO� CITY receiving clerk <br /> and copies provided to the Motorola Program Manager. <br /> REDWOOD CITY will be responsble for providi.ng management of <br /> subscriber equipment fleet assignment andvehicle installation tracking. This <br /> management process will be coordinated with the Motorola Program <br /> Manager to track vehicle install progress and track installation quality issues.. <br /> The Motorola Prograzn Manager will work with REDW04D CTTY during <br /> the Project Kick Off IVieeting to assemble a process and plan for this critical . <br /> equipment management <br /> 1.17 r�ccErrarrc�'TESrnvG. - <br /> Motorola will test the Mobile Data System ia accordance with.the <br /> Acceptance Test Procedures included in this proposal. This approach allows <br /> for detailed and documented procedures to individual system items as well as <br /> a general opportunity to examine overall system performance. <br /> Records of the test results will be gathezed and vuitnessed by Motorola and <br /> agencies of Redwood City.Any defects detected during this testing are to be <br /> . <br /> QMOTOROLA + 4 - 1�4 <br /> . _ _ ___ _ . <br />