Laserfiche WebLink
Redwood City Police <br /> Department Acceptance Test Pian <br /> ' Test Procedure Overview . <br /> The test requires two people from the Redwood City Police Department, one <br /> person at the test host, and one person with the MW520. The Redwood City <br /> Police Department will provide radios so that these two people can coordinate <br /> their activities. - � <br /> For each link test, 100 test messages are sent from the MW520 to the test host, <br /> then 100 test messages from the test host to the MW520. A successful link test <br /> is based on a 95%acceptance criteria. A 95% acceptance criteria recZuires that <br /> 95 of the 100 messages transmitted inbound and outbound arrive at the <br /> destination device on the first transmission attempt. A transmission attempt is <br /> defined as one physical PTT transmission and includes two automatic retries. <br /> The following steps are to be carried out for each link test: <br /> Set-up <br /> 1. Prior to the test, verify the test equipment set-up. _ <br /> 2. Start the mobile and host emulation test soflwaze applications. <br /> Manually exchange messages between the test host and the MW520, ensuring <br /> RF link reliability. <br /> Test <br /> 1. The test host authorizes the MW520 under test <br /> 2. All statistics queues in the RNC3000 are reset to zero,and the test host <br /> operator instructs the MW520 operator to start the inbound message <br /> generation. The MW520 operator initiates the transmission of 100 inbound <br /> messages of 100 chazacters each to the test host <br /> 3. After 100 test messages,the MyV520 operator instructs the test host <br /> operator to start the outbound message generation. <br /> 4. The test host operator initiates the transmission of 100 outbound <br /> messages of 100 characters each to the MW520. <br /> �MOrofrot.a ' 5 "9 <br /> . _ __ _. _ _ _. __._. <br />