My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-01-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-01-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2018 12:26:31 PM
Creation date
1/18/2018 1:21:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/22/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
500
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.A. - Page 13 <br />D) Second Floor "Admin Areas" Total Dimension = 5000 Square Feet/Approx. <br />xi) Admin Areas —"Office Areas": (include all hallways) <br />(1) Product: Interface <br />(2) Collection: "WW 865" <br />(3) Color: 50% "Highland Warp" #105369 <br />(4) Color: 50% "Loch Warp" #105368 <br />xii) AdminAreas— "Tech Processing" <br />(1) Product; Interface <br />(2) Collection: "WW 865" <br />(3) Color: 50% "Highland Warp" #105369 <br />(4) Color: 50% "Loch Warp" #105368 <br />Aii)AdminAreas —" Lounge„ <br />(1) Product: Interface <br />(2) Collection: "WW 895" <br />(3) Color: "Highland Weave"#105377 <br />6) Performance of Contractor and Inspection and Oversight <br />1. General: <br />Contractor shall provide skilled and competent workers to perform all work in a timely, <br />neat, and orderly manner. City reserves the right to refuse to accept work or workers <br />who do not meet these standards. Contractor shall be responsible for any damage <br />caused by their operations and shall repair or replace, as directed by the City, said <br />damage within a reasonable time. <br />2. City's Right to Inspect and Require Work: <br />The City reserves the right to make inspections whenever necessary to ascertain that <br />the requirements of this agreement are being fulfilled. Deficiencies noted shall be <br />promptly corrected at Contractor's expense. <br />If Contractor fails to perform the work required by the terms of this agreement in a <br />diligent and satisfactory manner, the City may, after 15 days' written notice to <br />Contractor, perform or cause to be performed, all or any part of the work required <br />hereunder, Contractor agrees that it will reimburse the City, and the City may deduct <br />the amount from any sum owed Contractor. The waiver by the City of a breach of any <br />provision of this agreement by Contractor shall not operate or be construed as a waiver <br />of any subsequent breach by Contractor. <br />Page 10 of 11 <br />REV: 12-14-17 M[ <br />ATTYIAGR.2017.2931On the Surface Flooring <br />
The URL can be used to link to this page
Your browser does not support the video tag.