Laserfiche WebLink
8.C. - Page 16 <br />Estimated City Impact Fees and Developer's Community Benefits <br />Proposed Harbor View Project (CP — Commercial Park Zoning) <br />1,179,747 square feet of Office Use <br />Required Fee <br />Fee Calculation/Assumption <br />Proposed General <br />Plan (Office w/ 1.0 <br />FAR) <br />Traffic Impact <br />Based on $2.38/square foot <br />$2.8m <br />Blomquist frontage <br />Applicant estimates Blomquist frontage <br />$2.1m <br />improvements and traffic <br />improvements at $2.1m <br />signal <br />Required improvements not yet determined <br />Sewer, Water & Wastewater <br />$5.2m <br />Blomquist Bridge <br />"Blomquist Bridge" — is the approximately <br />$11.2m <br />$25 million project to construct a new <br />bridge across Redwood Creek, between Bair <br />Island Road and the Watt/Strada property. <br />$11.2m is applicant's estimated fair share <br />contribution. <br />Fair Share Infrastructure <br />East 101 Fair Share projects include; <br />$6.5m <br />(except Blomquist Bridge) <br />Blomquist Extension, 101 Undercrossing, a <br />water main across the bridge, emergency <br />water storage and water tank land, widening <br />of E Bayshore and Blomquist south of Maple <br />Affordable Housing Fee based on $20/square foot. Assume $17.6m <br />union labor with 25% fee reduction <br />Art in Public Places Fee calculated 1% of the $240m $2.4m <br />construction value for the project. Assumed <br />$205/square foot in construction value <br />School impact Fee based on $0.56 per square foot $0.6 <br />TOTAL I I $48.4M <br />Blomquist Bridge <br />Woodside 101/84 Interchange <br />Community shuttle <br />Waterfront park <br />Public open space (property perimeter) <br />Community Philanthropy <br />TOTAL <br />Developer Offer in addition to Required fees <br />Prefund and construct work. City would need to pay back <br />portion of bridge costs beyond developer's fair share <br />contribution. <br />$10m <br />$2.25m <br />$5.1m <br />$2.25m <br />+ $19.6m <br />