My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-01-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-01-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2018 12:26:31 PM
Creation date
1/18/2018 1:21:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/22/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
500
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.A. - Page 1 <br />REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br />January 22, 2018 <br />SUBJECT <br />Main Library Carpet Replacement <br />RECOMMENDATION <br />Approve and authorize by motion the City Manager to execute an agreement with On <br />the Surface Flooring, Inc. of Hayward, California in the amount of $173,800 to replace <br />the carpet in the Main Library <br />BACKGROUND <br />The carpet at the Redwood City Main Library needs to be replaced. The existing carpet <br />was installed in the year 2000; in 2010, minor repairs were completed. Due to heavy <br />foot traffic, the existing carpet is showing extreme wear in many areas. The replacement <br />of the heavily used and well-worn carpeting will provide a safer and more pleasing <br />environment for library patrons and staff. <br />ANALYSIS <br />The Public Works Services (PWS) Department manages the carpet replacements in <br />City facilities. Industry standards set the average useful life of carpet at 7 to 8 years <br />depending on use. The carpet in the Main Library is approximately 17 years old and is <br />well past its useful life. PWS plans to replace the existing carpet with carpet tiles that <br />can be removed and replaced in a more cost effective fashion than conventional roll <br />carpet. <br />The project area for carpet replacement is approximately 23,000 square feet. The work <br />will occur during normal hours of operation for the Downtown Main Library facility. Work <br />in the public areas of the Library will be performed one location at a time and will be <br />coordinated with Library staff to reduce the impact on Library patrons and programming. <br />Work in administrative areas will occur during weekend Library hours to minimize the <br />impact on administrative staff. <br />PWS released a Request for Proposals on October 20, 2017. Bids were due on <br />November 15, 2017. Two proposals were received by the due date, and two proposals <br />were received after the due date. The lowest proposal, from On the Surface Flooring, <br />Inc. in the amount of $173,800, was selected based upon price and positive past <br />experience with On the Surface Flooring, Inc. Below is a summary of proposals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.