My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 BKF Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 Under $60K
>
Agmt05 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2009 12:34:43 PM
Creation date
9/1/2005 12:39:49 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
emergency work - 5th Avenue storm drainage pump station
RMP File Number
304.5
Date
8/29/2005
Amendment
Yes
Box
6586
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Fifth Avenue Pump Station - New Discharae Box Culvert <br />Hours by Task <br /> <br />BKF Engineers <br />225 Shoreline Drive, Suite 200 <br />Redwood City, CA 94065 <br /> <br /> Senior ProJ Engineer Engineer Structural & <br /> TASKSIWORK SCOPE TOTAL Principal Manager IV III Electrical <br /> HOURS Hrs Hrs Hrs Hrs Engineers <br /> $167.00 $140.00 $135.00 $116.00 $138 <br />PHASE I. PRELIMINARY ENGINEERING <br />Task 1 Preliminary Engineering and Design Development Report <br /> - -- <br /> 1.01 Review of existing as-buin drawings and reports 16 10 4 2 S <br />1--- - <br /> 1.02 Existing storm drainage easement verification and ground survey 30 4 6 20 SU <br /> --' -~ <br /> 1.03 Optimizing box culvert design 6 6 <br />1--- ,- <br /> 1.04 Box culvert end wall design and wnh flap gate selection 14 4 4 6 S <br /> 1.05 Box culvert end wall design wnh existing 42" CMP tie-in 2 2 S <br /> 1.06 Permn application from environmental review agencies 42 2 24 16 <br />1---- -- - <br /> 1.07 Prepare preliminary project cost estimate 6 4 2 <br /> 1.08 Meeting wnh Cny staff to review findings 4 4 <br />1---- <br />1--- 1.09 Prepare brief design summary 10 4 4 2 S <br /> ---- <br /> 1.10 Incorporate Cny comments and prepare final design summary 7 4 2 1 S <br /> - <br /> 1.11 Administration including weekly project log 4 1 2 1 <br /> Task 1 Subtotal 139 1 46 24 39 33 <br /> Reimbursable Budget - -- <br /> Phase I . Preliminary Engineering Total <br />PHASE II. CONSTRUCTION DOCUMENTS PREPARATION <br />Task 2 50% Design Phase <br /> 2.01 Layout sheets for pump station discharge box culvert elements 22 2 20 --- <br /> 2.02 Finalize discharge box culvert and headwalls design 30 8 10 12 S <br /> 2.03 Complete easement survey and identify any addnion requirement 10 4 6 <br /> -- <br /> 2.04 Erosion control plan at Bay Front Canal 20 8 8 4 <br /> 2.05 Prepare outline specWication 16 2 8 6 S <br /> - <br /> 2.06 Design team review meeting 6 2 4 <br /> -- <br /> 2.07 Cny meeting during 50% design phase 6 2 4 <br /> 2.08 Preparation of submittal package 10 2 6 --~ <br /> 2.09 Administration including weekly project log 5 1 4 <br /> Task 2 Subtotal 125 3 36 58 20 <br />Task 3 95% Design Phase <br /> 3.01 Incorporate 50% Cny review comments 4 2 2 <br /> 3.02 Discharge box culvert design elements 8 2 6 <br /> 3.03 Box culvert end walls structure detail design 10 2 4 4 S <br /> 3.04 Completion of specification 12 4 6 2 S <br /> 3.05 Bid schedule and final design drawing preparation 10 4 6 --- <br /> 3.06 Prepare project cost estimate 4 2 2 --- <br /> 3.07 Design team meetings - Assume 2 6 4 2 <br /> 3.08 Cny meeting during 95% design phase - Assume 1 4 4 <br /> 3.09 Preparation of submittal packa\le 8 1 6 ~ <br /> 3.10 Administration including weekly project log 6 2 4 <br /> Task 3 Subtotal 72 2 29 34 7 <br />Task 4 100% Design Phase <br /> 4.01 Incorporate 95% Cny review comments 6 2 4 <br /> -- <br /> 4.02 Assemble bid package 11 2 8 1 S <br /> 4.03 Final submittal to Cny 3 1 2 <br /> -- <br /> Task 4 Subtotal 20 1 6 12 1 S <br />1----- <br /> Phase II Construction Document Preparation. Subtotal 217 6 71 0 104 28 <br /> Reimbursable Budget --- <br /> Phase II Construction Document Preparation. Total <br /> Project Total (Phase I and Phase II) <br /> <br />Abbreviations: <br />E - Electrical Engineer and Control - MTH <br />S - Structural <br />SU - Surveying <br /> <br />C:IDocuments and SettingslsshawlLocal SettingslTemporary Intemet FileslOLK221f1¡ef !lour psproposallOriginal Proposal <br /> <br />7/15/2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.