My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 BKF Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 Under $60K
>
Agmt05 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2009 12:34:43 PM
Creation date
9/1/2005 12:39:49 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
emergency work - 5th Avenue storm drainage pump station
RMP File Number
304.5
Date
8/29/2005
Amendment
Yes
Box
6586
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Deliverables: <br />. A 95% bid document package including complete plan set containing discharge <br />box culvert, end wall with flap gates, end wall with 42" tie-in, canal erosion <br />protection plan, and structural details <br />. Complete project specification package <br />. Engineers cost estimate <br />. Bid schedule <br /> <br />Task 4 -100% Design Phase <br /> <br />Final review comments from the City will be incorporated into the plans to produce the final plan <br />set that will be ready for bidding. <br /> <br />1. Incorporate 95% City review comments <br />2. Assemble bid package <br />3. Final submittal to City <br /> <br />Deliverab les: <br />. A 100% plan set and specifications including concrete box culvert design and <br />structural details <br /> <br />The Scope of Work listed above will provide the City of Redwood City with construction <br />documents for the twin box culvert to the Bay Front Canal. Modifications to the existing stonn <br />drain easement work and assistant to the City during bidding process are not included in our <br />scope work, but will be at time and material bases. Also additional pennit application effort <br />beyond nonnal application process and budgeted engineering time will be at time and material <br />bases. Constructions administration during construction can be provided if needed by the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.