Laserfiche WebLink
<br />Deliverables: <br />. A 95% bid document package including complete plan set containing discharge <br />box culvert, end wall with flap gates, end wall with 42" tie-in, canal erosion <br />protection plan, and structural details <br />. Complete project specification package <br />. Engineers cost estimate <br />. Bid schedule <br /> <br />Task 4 -100% Design Phase <br /> <br />Final review comments from the City will be incorporated into the plans to produce the final plan <br />set that will be ready for bidding. <br /> <br />1. Incorporate 95% City review comments <br />2. Assemble bid package <br />3. Final submittal to City <br /> <br />Deliverab les: <br />. A 100% plan set and specifications including concrete box culvert design and <br />structural details <br /> <br />The Scope of Work listed above will provide the City of Redwood City with construction <br />documents for the twin box culvert to the Bay Front Canal. Modifications to the existing stonn <br />drain easement work and assistant to the City during bidding process are not included in our <br />scope work, but will be at time and material bases. Also additional pennit application effort <br />beyond nonnal application process and budgeted engineering time will be at time and material <br />bases. Constructions administration during construction can be provided if needed by the City. <br />