Laserfiche WebLink
<br />Community Engagement – Draft Plan <br />Following development of the draft Plan, the project team went back to the community <br />to see if we had accurately identified and portrayed community priorities. Questions at <br />the workshops and in the online survey solicited feedback on: <br />· Favorite Tier 1 projects <br />· Projects that should be removed from the Tier 1 Projects list <br />· Favorite Signature projects <br />· Projects that should be removed from the Signature Projects list <br />· Rank project categories (see above list) <br /> <br />Survey findings: <br /> <br />· Favorite Tier 1 projects: El Camino Real Corridor Plan Implementation, Bicycle <br />Master Plan, Permanent Theatre Way Closure, New Downtown Street <br />Connections, Transit Access Improvements <br />· Projects to remove from Tier 1: Brewster Avenue Cycle Track, James Avenue <br />Cycle Track, Downtown Bicycle Parking <br />· Favorite Signature projects: 101/84 Interchange, Whipple Railroad Grade <br />Separation, Redwood City Transit Center Improvements (short and long-term) <br />· Projects to remove from Signature Projects: Commuter Ferry Service, Broadway <br />Streetcar Project, railroad grade separations at Chestnut and Maple streets <br /> <br />Table 1: Ranked Project Categories (favorite to least favorite) <br />Category Average Rank <br />Active Transportation Corridors 2.8 <br />Roadway Congestion and Delay <br />Improvements <br />3.1 <br />Complete Street Corridors and Placemaking 3.5 <br />Network Gap Closure, Connectivity and Safety 3.6 <br />Transit Accessibility and Service <br />Enhancements <br />4.2 <br />Transportation Demand Management 4.8 <br />Transportation Technologies and Innovations 5.1 <br /> <br />The following is a high-level summary of qualitative input received at the community <br />workshops, other discussions, CSAC study session and Planning Commission study <br />9.A - Page 9