My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2002-02-25
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2002
>
AgdaPkt 2002-02-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:51:37 PM
Creation date
3/11/2002 7:47:01 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
2/25/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
approximately 185' North of Middlefield Road to Stambaugh Street and join to the <br />existing pavements of Stambaugh Street. The construction includes the complete <br />removal of the existing roadway, the placement of new Class 2 Aggregate Base, asphalt <br />pavement, the construction of concrete curb, gutter and sidewalk on both sides of the <br />street, pavement marking, signing and striping, construct a storm drain system for <br />Willow Street including a drainage system for existing properties with frontage on both <br />sides of Willow Street located between 2233 Middlefield Road and Stambaugh Street. <br />All work shall be designed and constructed in accordance with Redwood City Standards <br />and Ordinances. Owner may, at its option, pay City an In Lieu Fee in the amount of <br />$124,931.00. The In Lieu Fee shall be paid at the time of Foundation Building Permit <br />issuance. <br /> <br /> Exhibit-Agmt-45011300-1 2 <br /> FXS/dr <br /> 02/04/02R, 02/12/02R <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.