My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2002-02-04
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2002
>
AgdaPkt 2002-02-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:51:39 PM
Creation date
3/11/2002 8:58:26 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
2/4/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. SCOPE OF WORK <br /> <br />may be required to prepare the EIR. If necessary, ESA will prepare a <br />memorandum that identifies any remaining information requirements. The <br />intent in this task will be to make maximum use of available information, <br /> but <br />also to verify and supplement it as necessary to insure the accuracy, <br />objectivity, and completeness of the EIR. <br /> <br />As part of this task, and in conjunction with the Alternatives Meeting <br />identified in Task 2, above, ESA will confirm with City staff the final <br />assumptions to be used in the EIR analyses concerning the project <br />description, the range of alternatives to be examined, impact significance <br />criteria, the bases for cumulative impact analyses, and any other analytic <br />assumptions that may require further resolution. On the basis of this <br />consultation, the review of public and agency scoping comments, and the <br />evaluation of available information conducted as part of this task, ESA will <br />identify any appropriate recommendations for revising the scope of work, <br />and will prepare any necessary scope revisions. <br /> <br />The project team will prepare the Administrative Draft EIR on the bases of <br />the information, criteria and analyses developed in Task 2. The <br /> <br /> Administrative Draft EIR will be prepared <br /> in <br /> accordance <br /> with <br /> current <br /> CEQA <br /> Guidelines and case law. Fifteen (15) copies and one (1) original of the <br /> ADEIR will b~ submitted to City staff for review. The following discussion <br /> presents the proposed outline of the EIR and strategic considerations related <br /> to the preparation and presentation of individual sections. <br /> <br /> Introduction <br /> The Introduction will briefly describe the relationship of the City's planning <br /> to that of the CEQA process; the principal characteristics and <br /> process <br /> objectives of the project; and the planning and scoping processes through <br /> which the EIR scope was developed. The Introduction will also describe <br /> briefly the role of the E!R in the overall planning process, <br /> and <br /> the <br /> procedural <br /> <br /> steps by which the EIR and the project application will be processed. <br /> <br /> Summary <br /> <br /> Thc Summary will describe the project and the alternatives, and will provide <br /> a summary table and narrative that outline the project's significant <br /> environmental effects, mitigation measures that would reduce or avoid those <br /> effects, residual levels of impact significance after mitigation, and principal <br /> of public controversy. As suggested by CEQA Ouidelines, the <br /> Summary will be limited to approximately 15 pages. <br /> <br /> Abbott Laboratories West Coast Research Center EIR 3-3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.