My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt00 Belmont, City of
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2000
>
Agmt00 Belmont, City of
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2005 10:48:48 AM
Creation date
9/16/2005 11:52:46 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Belmont, City of
PROJECT NAME
Ralston - 101 interchange and Island Park direct access cost shared agreement
RMP File Number
304
Date
9/12/2000
Reso Ref
13960
Box
6037
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ground surface. A temporary well will be constructed in each boring and a grab <br />groundwater sample will be collected. <br /> <br />;,. Each soil boring will be logged in the field utilizing the Unified Soil Classification <br />System. Office and field supervision for the drilling and logging operations will be <br />provided by a California registered civil engineer. <br /> <br />>- The temporary well materials will be removed and the boring will be abandoned to <br />the specifications of the San Mateo County permit requirements. <br /> <br />;,. Soil and groundwater samples will be containerized, labeled and transported to a <br />California certified laboratory for analysis under chain-of-custody proceedings. <br /> <br />>- Provide quality assurance/quality control (QAlQC) procedures during the field <br />activities. These procedures include decontaminating the sampling equipment prior <br />to, and following each use. Decontamination will consist of washing the equipment <br />in an Alconox@ solution, followed by a fresh water rinse, and subsequent distilled or <br />purified water rinse. Auger flights and drilling rods used during the advancement of <br />the borings will be steam cleaned prior to use on each subsequent boring. The soil <br />cuttings and decontamination fluids from drilling operations will be retained in 55- <br />gallon drums stored at the site pending the results of the laboratory analyses and <br />subsequent disposal following regulatory protocol. <br /> <br />c) Laboratory Testing <br /> <br />,.. <br /> <br />The soil and groundwater samples will be submitted to the analytical laboratory for <br />analyses on a standard 10-working day turn-around-time. Geocon will instruct the <br />analytical laboratory to homogenize all the aerial deposited lead soil samples prior to <br />analysis. <br /> <br />.,. Approximately 99 soil samples will be analyzed for total lead following EP A Test <br />Method 6010. <br /> <br />.,. Approximately 12 soil samples will be analyzed for soil pH following EP A Test <br />Method 9045. <br /> <br />'. <br />r <br /> <br />Approximately 16 soil samples and 8 grab groundwater samples will be analyzed for <br />total petroleum hydrocarbons as gasoline (TPHg), benzene, toluene, ethylbenzene and <br />xylenes (BTEX), and methyl tert-butyl ether (MTBE) by EP A Method 8020, and for <br />total petroleum hydrocarbons as diesel (TPHd) and motor oil (TPHmo) by EPA <br />:'v1ethod 8015, for volatile organic compounds (VOCs) by EPA Method 8260, semi- <br />VOCs by EP A Method 8270, and for C1\1\1 17 metals by EP A Method 601017000 <br />Series. <br /> <br />r Tht: analytical laboratory \-vi] be instructed to conduct soluble Icad analyses via the <br /> <br />City of Belmont - Routt' 1 () l/Rall tlJ II A Vi' IC Jfodificatiolls <br />Pro/wI'al - PS&E <br /> <br />() 7/{)ó/{){) <br />
The URL can be used to link to this page
Your browser does not support the video tag.