Laserfiche WebLink
<br />seeking input from the City and Caltrans. The most viable and cost efficient alternatives <br />will be selected for preparation of the draft Type Selection Report for CaItrans DOS <br />review. The Bridge General Plan will be included in the Type Selection report. Upon <br />receipt of comments, prepare fmal Type Selection Reports and meet with Caltrans DOS <br />in Sacramento for bridge and retaining wall type selection. <br /> <br />1.13 Pump Station Desi!?n Report <br /> <br />Prepare basis of design report for stormwater pumping facility to include: required pump <br />and motor size; wetwell sizing; equipment schedule; service size and power availability; <br />and preliminary pump station plans. <br /> <br />1.14 Landscape Concept Plan <br /> <br />A Landscape Concept plan will be prepared for City and Caltrans review. Landscape <br />Concept plan will include major design features such as plant types and general layout <br />and spacing. Irrigation will not be included at this phase. The approved Landscape <br />Concept plan will be the basis for the Landscape & Irrigation plans to be developed and <br />submitted with the 65% PS&E submittal. <br /> <br />TASK 2 SURVEY - RIGHT OF WAY ENGINEERING <br /> <br />2.1 Field Survey for Desi!?n <br /> <br />Field surveys will be performed to verify utilities and drainage facilities, pavement <br />elevations, potholing, conform areas, vertical clearances, obstructions, tree locations, <br />drainage swales/ditches, lighting features, fences, curbs, structures, and other features <br />necessary to complete the design. <br /> <br />2.2 Right of Way Engineering <br /> <br />MTCo will provide right of way engineering servIces In compliance with Caltrans <br />District 4 current requirements as follows: <br /> <br />0 Hardcopy Maps will be prepared showing the existing and proposed right of way, and <br />the control lines for the Ralston Avenue overcrossing and the on/off ramps. The <br />existing right of way lines will based on Caltrans' record maps, MICa field surveys, <br />and preliminary title reports. Ihe Draft hardcopy maps will be submitted to Caltrans <br />for review. Caltrans' comments will be incorporated and a Final Hardcopy Map will <br />be submitted for Caltrans' approval. <br /> <br />!:J Appraisal Maps will be prepared based on the approved hardcopy maps. Appraisal <br />maps will be prepared only for those areas that require right of way acquisition and <br />will show the proposed right of way acquisition and easements, and other pertinent <br />infom1ation :lI1d data. In accordance with Caltrans' stmdards. A Draft Appraisal fv1Jp <br /> <br />CiTy of BelmO/ll - Rollte 10 IIRalstoll A VI' IC ,¡'fodificatiolls <br />Proposal ~ PS&E <br /> <br />07/06/()() <br /> <br />9 <br />