Laserfiche WebLink
<br />ESTIMATED LEVEL OF STAFFING FOR Prepared by: Mark Thomas & Co. Inc. <br />ROUTE 101/RALSTON IC MODIFICATIONS PROJECT 7/8/00 <br /> Mark Thomas & Co. TOTAL Parikh & Sugimura TOTAL Fehr & Peers/Schaal & Wheeler TOTAL TOTAL <br /> 2 Man (Geotech & Landscaping) (Electrical/Pump Station) HOURS <br />TASK JC/PC PE SR DE DE SURVEY MTCO PM PE Dgr. Subs PM PE Engr Subs ALL <br />Task 1. Management, Reports, etc. <br />1 1 Project Managemenl & Meetings 360 64 424 424 <br />1 2 Data Gathenng & Field RevlewNenfication 8 40 36 48 132 10 24 4C 74 206 <br />1 3 Lane Closure Report 4 8 12 8 32 1E 56 68 <br />1 4 Utility Coordination 8 48 64 80 200 200 <br />1 5 Drainage Report 24 80 120 80 304 304 <br />1 6 Survey Report 64 36 4C 140 140 <br />1ì Storrnwater Pollution Prevention Report 8 32 16 40 96 96 <br />1 8 Utility Potlwllng 24 16 24 48 112 112 <br />1 9 Geotechnical Reports 38 144 18( 362 362 <br />1 10 Aenally Deposited Lead Report 4 4 8 8 <br />1 11 Phase II Tesllng <br />1 12 Type Selection Studies and Reports 24 40 36 40 140 140 <br />1 13 Pump Station Design Report 4 6 10 32 40 72 82 <br />1 14 LandsCdpe Concept Plan 16 24 40 80 80 <br />Subtotal Task 1 504 376 288 312 88 1,578 54 168 22C 442 18 56 5f 202 2,222 <br />Task 2. Survey. RJW Engineering <br />2 1 Field Survey lor Design 8 80 36 24 16( 308 308 <br />22 Right 01 Way Engineering <br />a) Hôrrjcopy MdpS 60 144 144 8( 428 428 <br />b) Appraisal Maps 36 80 96 212 212 <br />c) Field Surveys lor Coilirois 16 40 8( 136 136 <br />d) Record 01 Sulvey 16 48 64 4C 168 168 <br />e) Right 01 Way Reeürd Map 12 64 80 156 156 <br />Subtotal Task 2 148 456 36 408 36C 1.408 1.408 <br />Task 3. Preliminary 35% Design <br />] 1 Line Drawrngs <br />a) TllierryplCdI Sections 6 16 48 96 166 166 <br />b) Layoul'Profi,esIRetalnrng Walls 8 240 400 360 1,008 1,008 <br />c) Drainage 8 56 96 80 240 240 <br />d) Pump Station 4 6 16 26 24 40 8C 144 170 <br />e) Pavement Delineation 2 16 48 64 130 130 <br />I) Signing 2 16 40 80 138 138 <br />g) Signals'Ramp Metcfw,g/Llghltng Concept 8 8 16 24 80 12C 224 240 <br />II} l andsc.ape & Irngallon 8 8 16 32 32 4C 104 120 <br />I) Bndge Plans and Details 8 24 16 32 80 <br />Subtotal Task 3 38 390 648 744 1,820 32 32 4C 104 48 120 20C 368 2,292 <br /> <br />Page 1 of 4 <br /> <br />x <br />ro <br />(/J <br />Mo <br />x. <br />::r <br />f-":Z <br />0"0 <br /> <br />1 <br />