<br /> ESTIMATED COSTS FOR Prepared by: Mark Thomas & Co. Inc.
<br />ROUTE 101/RALSTON IC MODIFICATIONS PROJECT 7/8/00
<br /> MARK THOMAS & CO. INC. TOTAL Parikh & Sugimura TOTAL Fehr & Peers/Schaaf & Wheeler TOTAL TOTAL
<br /> 2 Man Reimb. (Geotech & Landscaping'j (Electrical/Pump Station) EST.
<br />TASK JC/PC PE SR DE DE SURVEY MTCO PM PE Sr. Dgr. Relmb. Subs PM PE Engr Reimb. Subs COSTS
<br />Task 1. Management, Reports, etc.
<br />1 1 Project t.1anagement & Meetings 46.805 7,043 53,847 53,847
<br />1 2 Data Gathering & Field ReYiewNerrncatlon 1.040 4.402 2.705 2,577 250 10,974 1,344 2.451 3,200 6,995 17,969
<br />1 j Lane Closule Rel'on 520 880 1.400 1,075 3,268 1,280 5,623 7,024
<br />1 4 UIIIII)' COoi.Jil1aUcil 1.040 5.282 4,810 4.294 150 15,576 15,576
<br />1 5 Or"lnag~ Reporl 3,120 8.804 9,018 4.294 125 25,361 25,361
<br />1 6 Slmey Repor1 8,321 3,962 6,320 18,602 18,602
<br />1 7 Stormwaler Pollution PreventIon Report 1.040 3,521 1,202 2,147 350 8,261 8,261
<br />1 8 Utility Fottlúllng 2,641 1,202 1,288 7,584 16,200 28,916 28,916
<br />1 9 Geotechnical Repons 1,040 3,521 1,202 2,147 350 8,261 5,046 12,830 10,291 25,500 53,667 61,928
<br />1 10 Aenally Deposited Lead Report 520 440 15,650 16,610 16,610
<br />1 11 Prlase II Testing 14,200 14,200 14,200
<br />1 12 Type Selection Studies and Reports 3,120 4,402 2.705 2,147 12,375 12,375
<br />1 13 Pump Station Design Report 520 660 1,180 4,300 4,085 8,386 9,566
<br />1 14 Landscape Concept Plan 2,125 2,138 2.287 6,550
<br />Subtotal Task 1 67,087 45,558 22,846 18,895 13,904 47,275 215,565 7,170 14,969 12,578 25,500 60,217 6,720 9,805 4,479 21,004 290,237
<br />Task 2. Survey. RfVý Engineering
<br />2 1 Field Survey lor Design 1,040 8,804 2.705 1,288 25,280 39,117 39,117
<br />22 Rigtil of Way Engineering
<br />at Hardcopy 1.1aps 7,801 15,846 7,730 12,640 500 44,517 44,517
<br />bl Appraisal r.laps 4680 8,804 5,153 250 18,887 18,887
<br />cl Field Surveys for Conlrols 2080 4.402 12,640 19,122 19,122
<br />(j) Record of Survey 2,080 5.282 3.436 6,320 17,118 17,118
<br />e) RIgt1l of Way Record Map 1,560 7,043 4,294 12,897 12,897
<br />Subtotal Task 2 19,242 50,180 2.705 21,901 56,880 750 151,659 151,659
<br />Task 3. Preliminary 35% Design
<br />3 1 Line Drawings
<br />a) TltielTyplcal SecllùllS 780 1.761 3,607 5,153 11,301 11,301
<br />bl LayouUProllles/Relalrllrrg Walls 1,040 26.411 30,061 19,325 3,500 80,336 80,336
<br />c) Dralllage 1.040 6,162 7,215 4,294 18.712 18.712
<br />d) Pump Station 520 660 859 2,039 3,225 4,085 6,399 13.710 15.749
<br />e) Pavement uelineallon 260 U61 3,607 3.436 9,064 9,064
<br />II Signing 260 U61 3,006 4,294 9,321 9,321
<br />g! SlgnalsiR amp r.1etermg'Llgrlllllg Concept 880 429 1,310 3,225 8,171 9,599 450 21.445 22,755
<br />r¡) Landscape & Ilrlgallùn 880 429 1,310 4,464 2,995 1,560 9,019 10,329
<br />I) [iridge Plans and Details 1,040 2,641 1,202 1.718 6,601 6,601
<br />Subtotal Task 3 4,940 42,917 48,698 39,938 3,500 139,994 4.464 2,995 1,560 9,019 6,451 12,256 15,998 450 35,155 177.566
<br />
<br />Page 3 of 4
<br />
|