My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt00 San Mateo, County of (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2000
>
Agmt00 San Mateo, County of (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2005 10:49:04 AM
Creation date
9/16/2005 12:15:26 PM
Metadata
Fields
Template:
Agreement
Contractor Name
San Mateo, County of
PROJECT NAME
reconstruction & resurfacing Canyon Road
RMP File Number
304
Date
4/11/2000
Reso Ref
13855
MO Ref
00-203
Box
6037
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />sawcurring of asphalt co' <br /> <br />~re pavement and Ponland cement cc- <br /> <br />'ere, installation of water <br /> <br />services and appunenances, insl3.11arion of fire hydranT assembly, replacement of sarnrarj <br /> <br />sewer laterals. reconstruction and/or replacement of sanitary sewer cleanoUls, and other items <br /> <br />of work associated with roadway reconstruction, project administration, surveying, <br /> <br />construction management and construction contingencies, Bm in no case will the City's share <br /> <br />of the said preparation of plans and speciñcarions, mobilizarion, maimaining traffic, adjust <br /> <br />sanitary sewer manhole to grade, reconstruct sanirary sewer manhole, adjust warer valve box <br /> <br />to grade, adjust water meter box to grade, adjust sanitary sewer cleanour box to grade, <br /> <br />exploration of sanitary sewer laterals, clearing and grubbing, tree removal, fire hydrant <br /> <br />removal, develop and apply water. roadway excavation, frnishing roadway, aggregate base <br /> <br />(class 2), asphalt concrete (class B), place asphalt concrete (miscellaneous areas, driveway <br /> <br />confonns), class 2 concrete (miscellaneous construction, concrete cap), miscellaneous drainage <br /> <br />facilities, miscellaneous iron and steel, installarion of traffic stripes, pavement markings. <br /> <br />pavement markers and traffic signs, sawcutting of asphalt concrete pavement and Portland <br /> <br />cement concrete, installation of water services and aDDurtenances, installation of fIre hydrant <br />. . . <br /> <br />assembly, replacement of sanitary sewer laterals, reconstruction and/or replacement of sanitary <br /> <br />sewer cleanoutS, and the other items of work associated with roadway reconstruction, project <br /> <br />administration, surveying, construction management and construction contingencies exceed the <br /> <br />sum of $198,000 withom the approval of the City. Any contract change orders on the City's <br /> <br />portion of the construction work will be subject to the written approval by the City. It is <br /> <br />understOod that the total sum to be reimbursed to the County by the City shall be determined <br /> <br />from the actual costs incurred by the County to reconstruct said City portion of Canyon Road. <br /> <br />6. <br /> <br />The City shall have the option to exclude or modify (by deletion or <br /> <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.