My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 Beals Alliance
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 Beals Alliance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2007 3:28:42 PM
Creation date
9/19/2005 9:53:16 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Beals Alliance
PROJECT NAME
synthetic turf conversion
RMP File Number
304
Date
9/16/2005
MO Ref
05-168
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />5. Geotechnical investigation and report to enable design of the synthetic turf surface and any <br />required structural items. <br />6. Other pertinent data including water source, controller location, power source, site grading, and <br />any specific owner requests regarding field design and maintenance. <br />7. Program use criteria by the City user groups, including interscholastic use as applicable. <br /> <br />SPECIAL PROVISIONS <br />A. Without attempting to be all-inclusive and for purposes of clarity, the following items are specifically <br />not included in the Scope of Services: <br />1. Meetings other than those listed. <br />2. Presentations to public bodies, other than those listed. <br />3. Project design documentation or costing in addition to what is noted above. <br />4. Engineering (Geotechnical, Mechanical). Structural Engineering services will only be <br />provided for the sport field lighting design at McGarvey Field and the perimeter fencing / <br />netting system for Griffen-Bechet Field. Electrical Engineering will be provided only for the <br />Red Morton site improvements identified above. <br />Topographic Survey Work <br />CEQA documents. <br />DSA processing, meetings, or coordination. <br /> <br />5. <br />6. <br />7. <br /> <br />B. <br /> <br />Services will be diligently pursued and every reasonable effort will be made to meet the mutually <br />agreed upon schedule. If the completion of the services is delayed at any time in the progress of <br />the work undertaken in this Agreement by conditions beyond the control of the Consultant; <br />including but not limited to: strikes, lockouts, labor disputes, or the inability of Client, their <br />consultants, utility companies, or jurisdictional agencies to provide required information, <br />processing or direction; the time of completion shall be extended during such period and <br />Consultant shall be held harmless from any and all claims arising out of such delay. <br /> <br />PROFESSIONAL COMPENSATION <br />The fixed fee for the above services is based on the current hourly rate of the office as defined in the <br />attached Charge Rate Schedule. <br /> <br />Beals Alliance respectfully requests the following fixed fee for the services outlined in the Scope of Work. <br />This fee is based on the anticipated work effort that will be required to successfully complete this project <br />(based on our experience on the synthetic turf field projects) and is also based on an anticipated <br />construction budget of $4,000,000. The below fees also include the design fees of our electrical and <br />structural engineering consultants. <br /> <br />Project Start-up and Pre-planning: <br /> <br />$ 19,950 <br />$ 27,875 <br /> <br />Analysis and Design: <br /> <br />Design Development: <br /> <br />$ 70,700 <br />$ 77,650 <br /> <br />Construction Documentation: <br /> <br />Reimbursible Allowance: <br />TOTAL FEE: <br /> <br />$ 3,500 <br />$199,675 <br /> <br />As noted above, beals alliance will be entitled to bill reimbursable expenses as noted on the attached <br />Charge Rate Schedule. Additional services will be charged on a time and material basis. Charges for <br />additional services will be billed separately. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.