My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 Beals Alliance
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 Beals Alliance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2007 3:28:42 PM
Creation date
9/19/2005 9:53:16 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Beals Alliance
PROJECT NAME
synthetic turf conversion
RMP File Number
304
Date
9/16/2005
MO Ref
05-168
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PRODUCTS <br />The following products will be provided to the City by phase: <br /> <br />A. <br /> <br />Project Start-up and Pre-planning <br />1. Meeting Reports <br /> <br />B. <br /> <br />Analysis & Design <br />1. Draft Conceptual Design Plans (three sets of bond plans - one for each of the four park <br />sites) <br />Final Concept Design Plans (four mounted two dimensional digital colored rendering 30" x <br />42" plans) <br />Meeting Reports <br /> <br />2. <br />3. <br /> <br />C. <br /> <br />Design Development <br />1 . 50% Drawings and Design Development Manual (four sets of bond plans and bound <br />design development manuals) <br />2. Meeting Reports <br /> <br />D. <br /> <br />Construction Documentation <br />1. 95% Submittal Package - Three sets of bond drawings and bound project manuals <br />2. Bid Submittal Package - One set of signed vellum drawings and electronic copy of project <br />manual <br />Meeting Reports <br /> <br />3. <br /> <br />PROJECT TIMELINE <br />For the purpose of this proposal, we propose the following timeline: <br /> <br />Project Start-up and Pre-planning: <br /> <br />Three Weeks <br /> <br />Analysis and Design: <br /> <br />Four Weeks <br /> <br />Design Development: <br /> <br />Four Weeks <br /> <br />Construction Documentation: <br />95% submittal package: <br />Bid submittal package: <br /> <br />Six Weeks <br />Three Weeks <br /> <br />The above timeline does not include review times by the City. <br /> <br />CLIENTS RESPONSIBILITIES <br />In order to complete the items described in Scope of Services above, we request the City to provide the <br />following information. <br /> <br />A. <br /> <br />B. <br /> <br />Guidelines and Requirements <br />1. City/County codes, ordinances, and policies. <br />2. Development and maintenance practice guidelines. <br /> <br />Project and Site Information <br />1. Any available construction or record drawings of the existing fields. <br />2. Digital aerial photographs (already received). <br />3. Ground Topographic Survey in AutoCAD 2000 (or more recent version). <br />4. Utility survey of existing utilities and irrigation system - potholing as required in specific areas <br />as requested by our office. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.