My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 Beals Alliance
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 Beals Alliance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2007 3:28:42 PM
Creation date
9/19/2005 9:53:16 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Beals Alliance
PROJECT NAME
synthetic turf conversion
RMP File Number
304
Date
9/16/2005
MO Ref
05-168
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT -A- <br /> <br />Revised March 20, 2007 <br />March 19, 2007 <br /> <br />City of Redwood City <br />Mr. Peter Vorametsanti <br />1017 Middlefield Road <br />Redwood City, CA 94064 <br /> <br />RE: CONSTRUCTION ADMINISTRIATION SERVICES <br />SYNTHETIC TURF FIELD INSTALLATION PROJECT <br />Red Morton Park <br />Beals Alliance PROJECT No. 280505 <br /> <br />Dear Peter: <br /> <br />beals alliance, sport division, is pleased to submit the following additional service to provide continued <br />construction administration services on the above-referenced project. This proposal shall remain in effect <br />for sixty (60) days. <br /> <br />The additional scope for the construction phase of the project shall address the following work: <br /> <br />1. Construction Phase (on-going) <br />a. Attend regular construction meetings with the contractor, design team, and City. Meeting <br />agendas and reports will be provided. <br />b. Coordination regarding turf quality control and contract compliance. <br />c. Regular observation and review as required, considering weather and construction <br />practice. Observation Reports will be provided. <br />d. RFI coordination and processing (Contractor is IGP). <br />e. Develop RPQ's and Change Order evaluations (Contractor is IGP). <br />f. Substitution request evaluation. <br />g. General administration and coordination. <br />h. Respond to City requests, including any design. <br />i. Complete a substantial completion walk through for each field (at separate times) and <br />generate a punch list for each field area. <br />j. Quality control testing for testing synthetic turf to verify it meets project specifications. <br /> <br />2. Project Close-out <br />a. Review record drawings for utilities. <br />b. Final walk through and punch list for our scope of work. <br />c. Warranty evaluation and M&O documentation for our scope of work. <br />d. Close project and organize electronic files, plans and construction binder. <br />e. Cad contractor-provided modifications as indication on record drawings on Mylar prints. <br /> <br />Peter, for the above scope, Beals Alliance respectfully requests a time & materials (NTE) fee of $35,000 for <br />the services outlined in the Scope of Work, including an allowance of $3,000 for the synthetic turf materials <br />testing costs. <br /> <br />F:IBeals SportlJobs05\280005 - Redwood City Athletic Fields RevovationlContractlConstr Admin Add Service RWC-PeterV-synthetic turf fields <br />031907.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.