My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt97 Grossmann Design Group
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1997
>
Agmt97 Grossmann Design Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2005 10:49:25 AM
Creation date
9/19/2005 10:20:02 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Grossmann Design Group
PROJECT NAME
architectural design-Veterans Memorial Senior Center
RMP File Number
304
Date
8/19/1997
Reso Ref
13127
MO Ref
98-235 00-215
Task Order
Yes
Box
6037
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />added to the scope of the design work and nE:.. duct work. Work <br />tasks #1 and #2 include completing contract documents for the <br />HVAC equipment and duct replacement for which contract <br />documents are 70% complete.] <br /> <br />Scope of Hork <br /> <br />Ne~ Screen. Hall <br /> <br />8. <br /> <br />Prepare desigl! drawÌl!gs for: a I!ew screen wall Ìl!cludÌl!g tLe <br />followÌl!g. DELETE <br />À. Pr:epare sketcl!es illustr:atÌl!g tIle exteI!t al!d appearal!ce of <br />tIle l!ew scr:eel! wall for review. <br />13. Prepar:e contract dOCUIlLeI!ts describÌl!g cOI!structiOI! of tLe <br />I!ew scr:eel! wall. <br /> <br />The fees for completing the scope of work described herein are <br /> <br />as follows: <br /> <br />Work Task <br /> <br />Cost <br /> <br />#1 Complete Drawings [Previously 70% complete] - LUMP SUM <br />#2 Prepare Specifications - LUMP SUM <br /> <br />$2,960 <br />$2,580 <br /> <br />#3 Review Meeting - BUDGET ALLOWANCE <br />#4 Site Visit to Confirm Existing Conditions - [budget allowance included in #3] <br /> <br />$2,000 <br />$0 <br /> <br />#5 Site Visit to Evaluate Existing HVAC Equipment - [budget allowance included in #3] <br /> <br />$0 <br />$0 <br /> <br />#6 Recommendations Regarding Replacement of HVAC Equip. - [budget allowance included in #3] <br />#7 Contract Documents for Replacement of Existing HVAC Equipment and Duct Work - LUMP SUM <br /> <br />$7,660 <br />$a <br /> <br />N8 Dc3i§1"I of Ne.. Cerecl"I 'thdl delete <br /> <br />24X36 Sheets T&M [allowance - to be billed at cost] <br />ESTIMATED FEE <br /> <br />$1,000 <br />$16,200 <br /> <br />The Architect shall be compensated for all work performed in <br />connection with executing the work tasks noted as "BUDGET <br />ALLOWANCE" in accordance with the Archi tect I s standard hourly rates <br />for hours spent by the Architect, Architect I s employees, and <br />Architect's consultants executing the requested work. The <br />Architect's billing rates follow: <br /> <br />Architect's HOURLY BILLING RATES <br /> <br />CateGory <br />Principal <br />Associate Architect/Engineer <br />Senior Architect/Engineer <br /> <br />Rate per Hour <br />$135.00 <br />$120.00 <br />$95.00 <br /> <br />Regarding: CITY OF REDWOOD CITY, FAIR OAKS COMMUNITY CENTER <br />Subject: REVISED FEES TO COMPLETE CONTRACT DOCUMENTS <br />March 24, 2000, Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.