My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt00 Manna Consultants
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2000
>
Agmt00 Manna Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2005 12:10:03 PM
Creation date
9/22/2005 1:32:11 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Manna Consultants
PROJECT NAME
pro consulting engineering & design
RMP File Number
304
Date
12/5/2000
Reso Ref
14090
Box
6039
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City of Redwood City <br /> <br />EXHIBIT "A" <br />SCOPE OF WORK <br /> <br />Scope <br />Blomquist Street Extension <br /> <br />3.10 Mechanically stabilized embankment plans & details. Subject to the feasibility study, <br />approach ramps and abutments vvill use mechanically stabilized embankments (MSE). Manna vvill <br />prepare plans and details for the MSE walls. <br /> <br />3.11 Bridge plans and construction details. Manna Vvill prepare all structures plans (Refer to <br />Exhibit A.2 Preliminary Drawing List). <br /> <br />3.12 Pump station plans and details. Manna will prepare plans for the relocated pump stations, <br />including mechanical, electrical and structural systems and details. <br /> <br />3.13 Reinforced concrete box culvert plans and details. Manna Vvill prepare plans and details for <br />the new concrete box girder in accordance with drainage reports by WRECO. <br /> <br />3.14 Standard specifications provisions. Manna v.r:ill prepare projeCt-specific technical <br />specifications based on editing the City's specifications where needed. New provisions for bridge <br />construction and related seCtions v.r:ill be developed. <br /> <br />3.15 Final bridge hydrology report. WRECO 'Will prepare final bridge hydrology report. In <br />addition, the draft drainage reports for the box culvert and the pump station will reviewed in <br />conjunction with the plans for consistency of design. <br /> <br />3.16 Final drainage report. WRECO will submit the final drainage report for the site and the <br />bridge structure. <br /> <br />3.17 QA/Q!2 implementation. Manna will implement the submitted QAlQC as the project <br />progresses. This will include thorough review of the design procedures and calculations, drawings, <br />and specifications for the fmal submittal of the projeCt. <br /> <br />4.00 Milestone 3 - 95% Submittal <br /> <br />4.01 Revise plans. Manna will incorporcn:e review comments received from the 65% submittal, as <br />appropriate, into the 95% submittal package. Responses to each agency's comments will be <br />tabulated and tracked and distributed to provide closure. Design calculations will be checked, and <br />plans cross-referenced to provide coordination of details. A coordination check will also be <br />perfonned among the plans, specifications and Engineer's Estimate. <br /> <br />Manna will meet with the City to provide clarifications and resolve any outstanding issues prior to <br />submitting this package. <br /> <br />Quality check and documents will be submitted ",1Ïth the final set. <br /> <br />4.02 Revise SSP's. Manna will finalize specifications and will incorporate the City's comments. <br /> <br />4.03 Engineer's Estimate. Manna -will develop and compile the Engineer's Estimate for the <br />proJect. <br /> <br />11/06/00 <br /> <br />MANNA CONSULTANTS, me <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.