My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt00 Manna Consultants
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2000
>
Agmt00 Manna Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2005 12:10:03 PM
Creation date
9/22/2005 1:32:11 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Manna Consultants
PROJECT NAME
pro consulting engineering & design
RMP File Number
304
Date
12/5/2000
Reso Ref
14090
Box
6039
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />at)' of Redwood Cit)' <br /> <br />EXHIBIT "A" <br />SCOPE OF WORK <br /> <br />Scope <br />Blomquist Street Extension <br /> <br />2.18 Pump station hydrology report. "WRECO will prepare a hydrology report to serve as basis <br />for the sizing and design of the new pump station. This report will establish the expected volume of <br />storm water to be stored and eventually pumped via the relocated pump station. <br /> <br />2.19 Bridge drainage report. WRECO, in this report, will size and locate bridge deck drains and <br />lay-out the drainage lines consistent with the requirements of the environmental reports. <br /> <br />2.20 Redwood Creek diversion! drainage report. WRECO will prepare a drainage report to <br />detennine the need for water diversion during construction. This report will detem1Íne the expected <br />volume and expected heights of storm water that will flow through the box culvert. <br /> <br />2.21. Box culvert drainage report. WRECO will prepare a drainage report for the sizing the new <br />box culvert at the junction betWeen Maple and Blomquist. Another box culvert may be required at <br />the other side of Maple Street to drain water coming from the Docktown Marina side. These <br />detenninations will be established in the report. <br /> <br />3.00 Milestone 2 - 650/0 Submittal <br /> <br />3.01 Geometry. Manna will prepare roadway alignments based on the approved projeCt alternative <br />and incorporate necessary mitigations. <br /> <br />3.02 Roadway construction details. Manna will prepare a set of project plans and submit an <br />Engineer's Estimate using City standard Bid Item Codes!Descriptions. Boilerplate (unedited) <br />Standard Special Provisions (SSP's) will accompany this submittal. <br /> <br />3.03 Roadway drainage plans and promes. Manna will prepare roadway drainage plans and <br />profiles based on the drainage reports. <br /> <br />3.04 Roadway drainage details and quantities. Manna will prepare drainage details and drainage <br />quantities for the projeCt. . <br /> <br />3.05 Sanitary sewer. Manna will prepare plans and details to show protection for existing sewer <br />force main during and after construction. <br /> <br />3.06 Utilities. Manna will prepare plans showing existing and new utilities based on surveys and <br />design data. <br /> <br />3.07 Roadway quantities and cost estimates. Manna ",vill develop roadway quantities and cost <br />est1Illaœs. <br /> <br />3.08 Pavement delineation! plans and quantities. Manna will prepare pavement delineatíon plans <br />and estimate pavement quantities. <br /> <br />3.09 Lighting. Manna will prepare plans for bridge lighting with and power tíe to existing source. <br /> <br />11/06/00 <br /> <br />MANNA CoNSULTANrS, we <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.