Laserfiche WebLink
<br />City of Redwood City <br /> <br />EXHIBIT "A" <br />SCOPE OF WORK <br /> <br />Scope <br />Blomquist Street Extension <br /> <br />2.07 Prepare deed description and plat for ROW dedication. AP A will prepare plats and legal <br />descriptions for ROW dedications, and easements for the proposed Blomquist Street extension. <br /> <br />2.08 Roadway alignment. Manna will prepare the Blomquist Road extension's horizontal and <br />vertical alignments. The vertical alignment will be determined by the hydraulic reports, easement <br />requirements, and other design issues in the project. <br /> <br />2.09 Roadway typical cross sections. :Manna will prepare roadway cross sections based on the <br />geotechnical reports and final roadway grade elevations. <br /> <br />2.10 Roadway construction details. Manna will prepare plans showing roadway details and <br />dimensions. <br /> <br />2.11 Roadway drainage plans and profiles. <br />based on WRECO's drainage reports. <br /> <br />Manna will prepare drainage plans and profiles <br /> <br />2.12 Roadway drainage details and quantities. Manna will prepare plans showing drainage <br />details and estimate the quantities for roadway and drainage works. <br /> <br />2.13 Pump Station. Manna will prepare a bridge drainage report for the pump station. The <br />general layout and operation of the pump station will be configured similar to the existing facility. <br />'This report -will address issues relating to the mechanical, structural and electrical disciplines <br />affecting any decision to relocate and/or upgrade the pump station. <br /> <br />2.14 Box Culvert. Manna -will prepare a drainage report for a new box culvert at the junction of <br />Maple and Blomquist. This design -will consider the effects of constructing a new box culvert on <br />the hydraulics of the creek along Maple Street, and on the existing bridge access to the police <br />station. This work will interface issues related to the structural design of the pump station, and its <br />relocation. <br /> <br />2.15 Utility Plans. AP A -will survey existing utilities at both ends of the project and along the <br />alignment. Alignment of the proposed extension will be based on the findings obtained from this <br />analysis. AP A -will prepare plans of existing utilities. <br /> <br />2.16 HEC-RAS modeling and analysis. WRECO will perfonn hydraulic analysis using the U.S. <br />ATIny Corps of Engineers' HEC-RAS computer program to analyze the flow characteristics at the <br />proposed bridge site. Flow characteristics for the design of the bridge include the water surface <br />elevations (depths) and flow velocities. This will be used to establish the minimum bridge soffit <br />elevation and depths of bridge foundations. <br /> <br />2.1í Bridge scour analysis. WRECO will perform a bridge scour analysis in accordance with <br />Federal Highway Adrrllnistration BEC-18 manual. The flow characteristics obtained from the BEC- <br />RAS program will be used in the bridge scour analysis. The analysis -will determine the required <br />depths for foundations and any need for scour protection measures. <br /> <br />11/06/00 <br /> <br />MANNA CoNSULTANTS, INc <br /> <br />3 <br />