Laserfiche WebLink
<br />SCOPE OF SERVICES <br />NOVEMBER 29, 1999 <br /> <br />CIT'. )F REDWOOD CITY <br />EAST BA YSHORE ROAD WIDENING <br /> <br />CONSUL T ANT shall attend one preconstruction meeting with the CITY and the Construction <br />Contractor to establish construction procedures, communications, and discuss critical aspects of <br />the project. <br /> <br />TASK 7: <br /> <br />RECORD DRAWINGS <br /> <br />As part of the contract specifications, CONSULTANT shall require the Contractor to maintain an <br />up to date set of red lined plans documenting deviations from the contract documents. Based on <br />these red-lined plans, CONSULTANT shall prepare a set of "As-Built" Plans in AutoCAD <br />incorporating and clearly identifying the changes noted by the Contractor and deliver on disk or <br />tape to the CITY with a set of mylar plots. CONSULTANT shall prepare these within 6 weeks <br />of CITY'S acceptance of the Contractor's work. <br /> <br />TASK 8: <br /> <br />CONSTRUCTION SUPPORT <br /> <br />The CONSULTANT shall also perform additional services and provide engineering support <br />services during construction as to be determined. <br /> <br />ASSUMPTIONS <br /> <br />This scope of services and the CONSULTANT's associated design fee estimate is based on the <br />following assumptions: <br /> <br />. <br /> <br />Environmental services for this project are not required or will be provided by others. <br />Design shall be in imperial coordinates/units on a coordinate system to be provided by <br />the CITY. <br />CITY shall provide "front end" construction contract document (boiler plate). <br />CONSUL T ANT shall prepare the technical specifications. <br />CITY will provide the inspector and construction management, including materials <br />testing. Should any of these services be required, CONSULTANT has the capability to <br />provide these services, either directly or by a subconsultant, as extra work to this contract. <br />Utility relocation will not be required. <br />No permits from other than CITY agencies will be required. Should an encroachment <br />permit be required of Caltrans, this will be considered extra services. <br />This scope and associated fee assumes one update of the Task 3 - Preliminary Design <br />plans prior to beginning Task 4 - Final PS&E, with one associated resubmittal of the <br />preliminary design. <br />Staging of construction will utilize standard methods and will be addressed only in the <br />specifications, not on the plans. <br />No Right of Way acquisition will be required. <br />Updated Title Reports will not be needed, or will be supplied by the CITY. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />5 <br /> <br />NOLTE ASSOCIATES, INC. <br /> <br />N:\BDBALP A\Redwood City\Bayshore_seope_Rl.doe <br />