My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 Toyon Way subdivision
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 Toyon Way subdivision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2005 11:17:05 AM
Creation date
11/2/2005 11:05:50 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Toyon Way subdivision - Verne H Brown & Ronald L Brown & Sharon L Brown
PROJECT NAME
subdivision & maintenance
RMP File Number
304
Date
10/26/2005
MO Ref
05-212
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />herein, Owner shall furnish City with a complete set of plans and drawings showing the <br /> <br />Improvements in their actual or "as-built" condition and location. <br /> <br />8. GUARANTEE OF WORKMANSHIP AND MATERIALS. Owner agrees that if, <br /> <br />within a period of one (1) year after final acceptance of any work done under this <br /> <br />Agreement, the improvements furnished and/or installed or constructed or caused to be <br /> <br />constructed by Owner, or any of the work done under this Agreement, fails to fulfill any <br /> <br />of the requirements of this Agreement, or the plans and specifications referenced <br /> <br />herein, Owner shall upon receipt of a request in writing from City directing the work to <br /> <br />be done, without delay and without any cost to City, repair or replace or reconstruct any <br /> <br />defective or otherwise um~atisfactory part or parts of the Improvements or work. Should <br /> <br />Owner fail to act promptly to make such repair, replacement or reconstruction, or <br /> <br />otherwise to act in accordance with this requirement to repair, replace or reconstruct, or <br /> <br />should the exigencies of the case require that repair, replacement or reconstruction be <br /> <br />made before Owner can be notified, the City may, at its option, make the necessary <br /> <br />repair, replacement or reconstruction or perform the necessary work and Owner shall <br /> <br />pay the City the actual cost of thereof plus fifteen percent (15%). <br /> <br />Notwithstanding any provisions to the contrary as set forth in this Agreement, <br /> <br />Owner shall not be responsible for repair, replacement, or reconstruction of any <br /> <br />Improvements, necessitated by Acts of God, acts of third parties (other than Owner, its <br /> <br />agents, employees or contractors) beyond Owner's ability to control, civil emergencies, <br /> <br />natural disasters, or similar acts or events. <br /> <br />Atty/Agr/2005.065 <br />083005 <br /> <br />8 <br /> <br />sIlibrarylagreementsisubdivisionlSubdivision- Toyon Way <br />
The URL can be used to link to this page
Your browser does not support the video tag.